2.4MW 420-Slot Antminer Hydro Cooling Container (40HQ)
$103,500.00 – $147,800.00Price range: $103,500.00 through $147,800.00
AP-HC40-A420 hydro cooling container for up to 420 Antminer hydro miners, with pre-wired cabling, dual-loop cooling and individual rack protection. Choose a closed cooling tower or dry cooler solution. Marketed as 2.4 MW; the supplier specification lists 2,310 kW installed powerload.
Complete your order and payment first. Immediately after payment, visit our Order Customization page and submit the form with your customization requirements.
2.4MW 420-Slot Enterprise Hydro Cooling Container for Large-Scale Mining
⚙ Compatible Models
View More ›293Th/s · 19 J/Th
420 SlotsFull-load: $4,725.00/day➜Antminer S21 XP Hydro473Th/s · 12 J/Th
420 SlotsFull-load: $7,627.20/day➜Antminer S21+ Hydro358Th/s · 15 J/Th
420 SlotsFull-load: $5,770.80/day➜Antminer S21e Hydro310Th/s · 17 J/Th
420 SlotsFull-load: $4,998.00/day➜Antminer S23 Hyd580Th/s · 9.5 J/Th
420 SlotsFull-load: $9,349.20/daySupplier reference estimates, not live or guaranteed earnings. Actual results vary with miner settings, network conditions, coin prices and electricity costs.
Product Description
The AP-HC40-A420 hydro cooling container supports up to 420 Antminer hydro miners in a reinforced 40HQ structure. It combines pre-wired Bitmain cabling, a Gigabit fiber switch, individual rack protection and redundant water loops for large mining deployments.
Seamless stainless manifolds, fire-resistant insulation and automatic reclosing breakers support cooling distribution and maintenance access.
Core Advantages

01. Pre-Wired Cabling & Signals
Each slot has Bitmain power and network cabling with aviation plugs. A dedicated Gigabit fiber switch supports organized connectivity.

02. Redundant Dual-Loop Cooling
Seamless pipes and separate cooling loops support continued circulation if one side loses power. Red and blue markers identify hot and cold connections.

03. Stainless Manifolds
Built-in stainless-steel manifolds, mini ball valves and double-sealed quick connectors simplify connections and help reduce leakage.

04. Reinforced & Fireproof Structure
Motorized louvers, dust filters, fire-resistant insulation, internal-locking fasteners and reinforced base beams support the container structure.

05. Automated Reclosing Breakers
Independent rack power controls with matching labels, auto-reclosing breakers and lightning protection support electrical isolation and maintenance.

06. Leak Detection System
A moisture-sensing detection rope monitors for coolant leaks and triggers alarms.
Full Specifications
| Model | AP-HC40-A420 |
|---|---|
| Installed capacity | 420 seats |
| External dimensions (L × W × H) | 12192 × 2438 × 2896 mm |
| Internal dimensions (L × W × H) | 12000 × 2230 × 2660 mm |
| Weight | 9200 kg |
| Installed powerload | 2310 kW |
| Light-duty vertical multistage pump power | 30 kW |
| Fluid replenishing pump power | 0.2 kW |
| Total dry cooling tower fan power | 99.6 kW |
| Total closed cooling tower fan power | 33 kW |
| Total closed cooling tower spray pump power | 8 kW |
| System pipeline pressure | 0.2–0.4 MPa |
| System operating temperature range | 22–42°C |
| Coolant circulation demand per machine | ≥0.5 m³/h |
| Total circulating coolant demand | ≥2.2 m³ |
| Molded Case Circuit Breaker | 250 A |
| Residual Current Circuit Breaker | 630 A |
| Contactor | 9 A |
| Intermediate relay | 24 V |
| CUL certified frequency converter | 380 V |
The supplier markets this model as 2.4 MW and shows 2,400 kW in its overview, while the detailed specification and FAQ list 2,310 kW installed powerload.
Certification Standards
The supplier states that its products meet leading international standards for safety, reliability, and performance.

China Classification Society
Marine & offshore compliance

UL Listed
Safety tested & certified

CSA Certified
North American compliance

CE Marking
European conformity
Complete Cooling Solutions
Supplier-listed Antminer hydro cooling options for different deployment sizes.
| Model | ❄️ Cooling Capacity | ⚙️ Miner Slots | 📏 Dimensions (L × W × H) | 🏢 Application |
|---|---|---|---|---|
| 308-Slot Antminer Hydro Cooling Container | 1.7 MW | 308 Slots | 12,192 × 2,438 × 2,896 mm | Standard Industrial Operations |
| 364-Slot Antminer Hydro Cooling Container | 2.1 MW | 364 Slots | 12,192 × 2,438 × 2,896 mm | High-Density Mining Farms |
| 420-Slot Antminer Hydro Cooling Container | 2.4 MW | 420 Slots | 12,192 × 2,438 × 2,896 mm | Mega-Scale Utility Projects |
| 480-Slot Antminer Hydro Cooling Container | 2.6 MW | 480 Slots | 12,192 × 2,438 × 2,896 mm | Enterprise-Class Global Facilities |
Real Results from Real Miners
Supplier-reported projects and performance figures. These are supplier claims, not independently verified results or MiningUS customer testimonials.

Edmonton, Canada
12 × 2.4MW Hydro Project
Sustaining stable large-scale operations under heavy thermal loads.
+32% Cooling Efficiency
-25% Cooling Power Draw
$1.5M Annual Savings

Reykjavik, Iceland
5 × 2.4MW Hydro Project
Supplier-described hydro mining deployment powered by geothermal energy.
+100% Operational Uptime
-30% Setup Time
99.9% System Reliability
Supplier global deployment figures: 1.2+ GW cumulative delivered cooling capacity across 50+ countries and regions.
420-Slot Antminer Hydro Cooling Container FAQs
What voltage does the container support?
The supplier specifies three-phase 380V input, with a 380–415V AC 50/60Hz supply in its capacity overview. The PDU is configured for the listed 2,310 kW installed load.
What is recommended for very hot climates?
For ambient temperatures above 40°C, the supplier recommends an optional wet-curtain upgrade for the dry cooler and states that inlet water can be kept below 35°C. Confirm the cooling configuration and performance for the actual site climate.
How is coolant flow balanced?
Large-diameter stainless-steel manifolds and balanced hydraulic loops distribute coolant. The supplier states a temperature difference below 2°C between the first and last rows.
How are individual racks isolated?
Independent rack switches and auto-reclosing breakers support local power isolation. Breaker power must be disconnected before unplugging miner power cables.
How are maintenance leaks reduced?
Seamless stainless-steel manifolds, double-sealed quick connectors and isolation valves allow specific racks to be isolated for maintenance.
| Specification | Closed Cooling Tower Solution, Dry Cooler Solution |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.