C13 Power Cord 10A 250V For Antminer L7 S19 K7 DR7 Elphapex DG1+
$5.00
✓ Manufacturer Warranty
C13 power cord with copper conductors and molded PVC jacket. Choose CN, EU, UK or US plug. Supplier C13 connector rating: 10A, 250V; use within the complete cable assembly’s ratings.
C13 Power Cord for ASIC Miner Power Supplies
IEC C13 power cord with copper conductors, a molded PVC jacket and a choice of CN, EU, UK or US mains plug. The supplier lists a 10A, 250V C13 connector rating.
Compatibility includes suitable C14-inlet power supplies used with Antminer S19, L7 and K7, Iceriver KS1 and KS2, and Jasminer X16 and X16QE. Match the mains plug, voltage and current rating to the power supply and local outlet; the lowest-rated part of the complete cable assembly determines its usable rating.
Product Details




The supplier photographs illustrate a 150cm cable and a 3 × 0.75mm² conductor marking. Plug and cable markings should be checked for the supplied version.
Specifications
| Equipment connector | IEC C13 |
|---|---|
| Supplier connector rating | 10A / 250V |
| Mains plug options | CN, EU, UK, US |
| Conductor | Copper |
| Jacket | Molded PVC |
| Warranty | Manufacturer warranty |
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Antminer S19J Pro | BCH, BSV, BTC | $540.00 – $770.00 | 104Th/s | 3068W | 29.50J/TH | SHA-256 | 64 Mon | $ 0.28 /day |
| VolcMiner D1 Mini Pre | DOGE, LTC, BEL | $650.00 | 2.2Gh/s | 500W | 227.27J/GH | Scrypt | 90 Mon | $ 0.24 /day |
| Elphapex DG Home 1 | DOGE, LTC, BEL | $460.00 | 2Gh/s | 620W | 310.00J/GH | Scrypt | 767 Mon | $ 0.02 /day |
| Antminer L7 | DOGE, LTC, BEL | $650.00 – $670.00 | 9.5Gh/s | 3425W | 360.53J/GH | Scrypt | Never | $ -0.49 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Specification | CN Plug, EU Plug, UK Plug, US Plug |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.