Bitmain ANTPDU PW12V1 for Antminer T21 S21 S19jxp
$290.00
✓ Manufacturer Warranty
Bitmain PW12V1 power distribution unit for Antminer T21, S21 and S19j XP, with an 83 kW output rating, 12 × 6-pin ports plus one 4-pin port, and phase-status indicators.
Bitmain ANTPDU PW12V1
The PW12V1 distributes power to high-power Antminer systems, including the T21, S21 and S19j XP. Its 12 output ports support three-phase or single-phase operation according to the installation requirements.
A 125 A three-phase hydraulic electromagnetic circuit breaker provides overload and short-circuit protection. LED indicators show phase power status and three-phase load imbalance.
Specifications
| Model | PW12V1 |
|---|---|
| Compatible miners | Antminer T21 / S21 / S19j XP |
| Input voltage | 346–480 V AC, 3P+N+PE |
| Frequency | 50/60 Hz |
| Input current | 100 A, three-phase |
| Output rating | 83 kW |
| Three-phase output | 346–480 V AC |
| Single-phase output | 200–277 V AC |
| Output connections | 12 × 6-pin ports + 1 × 4-pin port |
| Circuit breaker | 125 A, three-phase hydraulic electromagnetic |
| Protection rating | IP20 |
| Operating temperature | −20 to 40°C |
| Operating humidity | 5–90% RH, non-condensing |
| Altitude | ≤2,000 m |
| Storage temperature | −40 to 70°C |
| Storage humidity | 5–95% RH, non-condensing |
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Antminer S21 XP | BCH, BSV, BTC | $3,105.00 | 270Th/s | 3650W | 13.52J/TH | SHA-256 | 18 Mon | $ 5.91 /day |
| Antminer S21 Pro+ | BCH, BTC | $1,685.00 – $1,985.00 | 234Th | 3510W | 15.00J/TH | SHA-256 | 12 Mon | $ 4.71 /day |
| Antminer S21++ | BCH, BSV, BTC | $1,318.00 – $1,504.00 | 235Th/s | 3878W | 16.50J/TH | SHA-256 | 10 Mon | $ 4.30 /day |
| Antminer T21 | BCH, BSV, BTC | $2,350.00 | 190Th/s | 3610W | 19.00J/TH | SHA-256 | 27 Mon | $ 2.91 /day |
| Antminer S19j XP | BCH, BSV, BTC | $1,480.00 | 151Th/s | 3247W | 21.50J/TH | SHA-256 | 27 Mon | $ 1.86 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Model | PW12V1 |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.