36-Slot 196kW Antminer Modular Liquid Cooling Cabinet
$0.10 – $2,660.00Price range: $0.10 through $2,660.00
36-slot AP-EA36 modular hydro cabinet with a listed 196kW load, designed for compatible Antminer S19/S21/S23 Hydro units. Cabinet Only: $2,660. CDU and external cooling solutions are quoted separately.
The $0.10 custom-solution option is an inquiry placeholder, not a complete-system price.
High-density 1-to-N infrastructure for up to 36 hydro-cooled ASICs
CONTAINER CAPACITY
36 UNITS
Housed at full load
196 kW
Continuous electrical load
Custom
Standard
Hydro
Thermal management
Supplier Availability: Typical lead time 15 days • DDP Sea Shipping Available. Confirm availability and destination with MiningUS.
Compatible Models
Supplier estimates captured September 13, 2026; actual returns vary with mining conditions and operating costs.
Product Description
The AP-EA36 split-type cabinet provides 36 dedicated Antminer Hydro positions with a listed 196kW load. Its 1-to-N design separates miner racks from a centralized CDU and power-control hub, simplifying piping and electrical distribution across larger facilities.
The modular architecture supports planned expansion while concentrating cooling and control equipment outside the individual miner racks. Confirm the exact miner models, total power and site infrastructure before ordering.
Core Advantages
01. Maximum Density Rack Layout
Six layers with six miners per layer provide 36 positions.
02. Industrial High-Flow Manifold
304 stainless-steel manifolds and precision joints distribute coolant across the rack.
03. Sealed High-Current Connectivity
Snap-lock aviation connectors with rubber seals and 12AWG cables help protect connections from dust and moisture.
04. Centralized Data Management
Integrated network switches and organized cabling support connectivity across all 36 slots.
05. Power Distribution
The supplier describes UL-compliant components and dedicated over-current protection for the power cabinet.
06. Scalable CDU
A centralized CDU supports multiple racks with pressure and flow monitoring.
Modular 1-to-N Infrastructure Scalability
The supplier describes configured systems scaling from 200kW to 1,000kW with a high-flow pump system and dedicated power-control cabinet. CDU and external cooling equipment require a separate configuration-specific quotation.

Full Specifications
| External dimensions | 1500 × 1000 × 2000 mm |
|---|---|
| Internal dimensions | 1450 × 950 × 1950 mm |
| Weight | 322 kg |
| Model | AP-EA36 |
| Installed capacity | 36 Seat |
| Installed powerload | 196 kW |
| Power of the light-duty vertical multistage pump | 4 kW |
| Power of the fluid replenishing pump | 0.2 kW |
| Total power of the dry cooling tower fan | 12.45 kW |
| Total power of the closed cooling tower fan | 3 kW |
| Total power of the closed cooling tower spray pump | 1.1 kW |
| System pipeline pressure | 0.2-0.4 MPA |
| Operating temperature range of the system | 22-42 ℃ |
| Coolant circulation demand of a single machine | ≥0.5 m³/h |
| Total demand for circulating coolant within the system | ≥0.36 m³ |
| Residual Current Circuit Breaker | 630 A |
| Contactor | 9 A |
| Intermediate relay | 24 V |
| CUL certified frequency converter | 380 V |
The source title and detailed specifications state 196kW; its comparison table below states 198kW. Confirm rated capacity for the supplied configuration. Listed pump, fan and cooling-tower specifications describe the associated cooling system and do not mean those components are included in Cabinet Only.

Certification Standards
The supplier states that its products meet leading international standards for safety, reliability, and performance.
China Classification Society
Marine & offshore compliance
UL Listed
Safety tested & certified
CSA Certified
North American compliance
CE Marking
European conformity
Complete Cooling Solutions
| Model | Cooling Capacity | Miner Slots | Dimensions (L × W × H) | Application |
|---|---|---|---|---|
| 36-Slot Antminer Hydro Cooling Rack | 198 kW | 36 Slots | 1,500 × 1,000 × 2,000 mm | High-Density Industrial Scaling |
| 28-Slot Antminer Hydro Cooling Rack | 154 kW | 28 Slots | 1,000 × 1,000 × 2,200 mm | Scalable 1-to-N Operations |
| 24-Slot Antminer Hydro Cooling Rack | 132 kW | 24 Slots | 1,000 × 1,000 × 2,000 mm | Flexible Facility Expansion |
| 20-Slot Antminer Hydro Cooling Rack | 110 kW | 20 Slots | 1,000 × 1,000 × 1,800 mm | Modular Small-Scale Setups |
Real Results from Real Miners
Supplier-reported deployment examples and performance figures.
Abu Dhabi, UAE
1-to-1 Dry Cooling Project
A dedicated dry cooler provides waterless heat rejection in an arid environment.
+28% Efficiency Gain · -23% Energy Cost · 99.9% Operational Uptime
Almaty, Kazakhstan
1-to-4 High-Density Scaling
A centralized water cooling tower serves four 36-slot racks, totaling 144 mining units.
+30% Space Efficiency · -28% Setup Time · 99.9% Thermal Stability
Supplier Global Deployment: 1.2+ GW cumulative delivered cooling capacity across 50+ countries and regions.
36-Slot Antminer Hydro Cooling Rack FAQs
Should I use a dry cooler or a closed cooling tower?
A dry cooler uses ambient air and suits water-limited sites. A closed cooling tower uses evaporation and requires a consistent water supply. Match the equipment to climate and available utilities.
What is included in Cabinet Only?
The cabinet is priced at $2,660. CDU, cooling tower and other customized cooling equipment require a separate quotation.
What does the $0.10 option mean?
It is an inquiry placeholder for customized CDU and cooling-tower solutions, not the price of a complete system. Contact MiningUS before ordering.
How does the system expand?
The 1-to-N layout connects multiple racks to a configured CDU and power hub. Confirm pump capacity, piping and electrical service for each expansion.
| Specification | Cabinet Only, Contact Us for Customized CDU & Cooling Tower Solutions |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.