154-Slot 870kW Antminer Liquid Cooling Rack

$4,999.00

AP-A154 hydro cooling rack for up to 154 compatible Antminer S19, S21 or S23 Hydro miners. Marketed as an 870 kW system; the detailed specification lists 847 kW installed load. Confirm the final system rating with your project quote.

Need Customization?

Complete your order and payment first. Immediately after payment, visit our Order Customization page and submit the form with your customization requirements.

Description

870kW 154-Slot Antminer Liquid Cooling Rack for High-Density Indoor Mining

Container capacity
ASIC miners
154 UNITS
Housed at full load
Total power
870 kW
Marketed rating; 847 kW installed load
Form factor
Custom
Rack configuration
Cooling
Hydro
Thermal management
Power input380V–415V AC 50/60Hz
AvailabilityTypical lead time: 45 days; confirm DDP sea delivery

⚙ Compatible Models

View More ›

Supplier reference estimates, not live or guaranteed earnings. Actual results vary with miner settings, network conditions, coin prices and electricity costs.

Product Description

The AP-A154 is an indoor hydro cooling rack for up to 154 compatible Antminer S19, S21 and S23 Hydro miners. Its open-frame structure combines miner mounting, coolant distribution, pump circulation and centralized controls for industrial mining sites.

The product is marketed as 870 kW, while the detailed table lists 847 kW installed power load. Confirm the final thermal rating, miner load limit and auxiliary power requirements in the project quotation.

Core Advantages

Integrated open-frame system

AP-A154 integrated open-frame system

Open-frame layout with 154 server positions, integrated CDU and central controls.

Quick-connect fittings

AP-A154 quick-connect fittings

Hoses and quick connectors support individual miner connections and maintenance.

Stainless steel CDU piping

AP-A154 stainless steel cdu piping

Manifolds distribute coolant through the system.

Leak detection

AP-A154 leak detection

A moisture-sensing rope detects coolant leaks and triggers an alarm.

Central power cabinet

AP-A154 central power cabinet

The listed configuration includes a 630 A RCCB and 125 A MCCB.

Touchscreen management

AP-A154 touchscreen management

Monitor voltage, pump VFD frequency and alarm history.

Full Specifications

ModelAP-A154
Installed capacity154 miner positions
Marketed system rating870 kW
Installed power load in detailed table847 kW
External dimensions (L × W × H)4880 × 1500 × 2700 mm
Internal dimensions as listed4880 × 1500 × 2700 mm
Weight3500 kg
Power input380–415 V AC, 50/60 Hz
Vertical multistage pump15 kW
Fluid replenishing pump0.2 kW
Dry cooling tower fans41.5 kW
Closed cooling tower fans13.2 kW
Closed cooling tower spray pump3 kW
Pipeline pressure0.2–0.4 MPa
System operating temperature22–42°C
Coolant circulation per miner≥0.5 m³/h
System coolant volume requirement≥1.6 m³
Molded case circuit breaker125 A
Residual current circuit breaker630 A
Contactor9 A
Intermediate relay24 V
Frequency converter380 V

Dry cooler and closed cooling tower power figures refer to different configurations. Auxiliary equipment power is additional to the miner load. Confirm final electrical design and equipment scope before deployment.

Project planning and delivery

Provide the delivery location, miner models, available electrical supply and project timeline for a configuration and freight quote. The supplier indicates a typical 45-day lead time; confirm availability and DDP sea shipping for your destination.

Contact MiningUS on Telegram · WhatsApp · Verify official contacts

Frequently asked questions

Can I mix Antminer Hydro generations?

The rack is listed for compatible S19, S21 and S23 Hydro models. Confirm model dimensions, coolant requirements and the combined load for a mixed deployment.

Is the system rated at 870 kW or 847 kW?

The title and overview state 870 kW; the detailed installed-load table states 847 kW. Confirm the final rated capacity and permitted miner load in your project quote.

How are coolant leaks detected?

A moisture-sensing rope monitors for leaks and triggers an alarm. Regular inspection and maintenance are still required.

Can multiple racks share cooling equipment?

A shared external cooling system must be sized for the combined thermal load, flow, pressure and site conditions. Request a project-specific design.

What maintenance should be planned?

Follow the supplied service schedule for coolant quality, filters, pumps, connections, sensors and electrical equipment. The final configuration determines maintenance intervals.

What warranty is included?

Confirm warranty coverage and duration in the project quotation. No fixed duration is stated on this source listing.

Want to Explore Similar Mining Options?

Explore All ASICs ››
ModelsCoinsReference PriceHashratePowerEfficiencyAlgorithmEst. PaybackEst. Profit
Antminer S21 XP HydroBCH · BSV · BTC$6,140.00473 TH/s5,670 W11.99 J/THSHA-25618 months$11.23 /day
Antminer S21+ HydroBCH · BSV · BTC$2,195.00–$2,645.00358 TH/s5,370 W15.00 J/THSHA-25610 months$7.21 /day
Whatsminer M63SBCH · BSV · BTC$2,720.00390 TH/s7,215 W18.50 J/THSHA-25615 months$6.21 /day
Antminer S19 XP+ HydBCH · BSV · BTC$1,150.00293 TH/s5,567 W19.00 J/THSHA-2569 months$4.49 /day
Antminer S19e XP HydBCH · BSV · BTC$750.00251 TH/s5,522 W22.00 J/THSHA-2568 months$2.95 /day

Swipe horizontally to view all specifications →

Illustrative comparison figures; prices, daily profit and payback are reference estimates, not live quotes or guaranteed returns. Results vary with electricity rates, network conditions and coin prices. Check the shop for current pricing.

Additional information
Rack capacity154 Antminer Hydro miners
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “154-Slot 870kW Antminer Liquid Cooling Rack”

Your email address will not be published. Required fields are marked *

Shipping and Delivery

Delivery costs shown before payment

Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.

Miners and spare parts

Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.

Cooling systems and heavy equipment

Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.

Customs and delivery support

Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.

Read the full shipping policy  |  Contact Mining US

Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.