12kW Water Cooling Radiator Support 2 Asic Miners
$300.00 Original price was: $300.00.$255.00Current price is: $255.00.
1 Year Warranty
The 12kW liquid cooling radiator AP-M2 supports water-cooled Bitcoin mining, running up to two mining machines at 32°C or one miner in higher temperatures.
Complete your order and payment first. Immediately after payment, visit our Order Customization page and submit the form with your customization requirements.
For most areas, the liquid cooling equipment will be shipped to you via sea freight. Ports and receiving points in different regions will incur different shipping charges. It is recommended that you contact customer service to confirm address details and calculate shipping costs before placing an order.
AP-M2 Description
The Liquid Cooling Radiator AP-M2 is a robust hydro cooling solution engineered for professional Bitcoin mining and high-performance ASIC mining operations.
Designed to support one or two water-cooled miners depending on ambient temperature, it provides reliable hydro cooling fAntminer S19/S21/S23 Hydro, Antminer 3U Hydro Miner, Whatsminer M79/M73/M63 /M53 series hydro, as well as other hydro cooling miners such as SealMiner A2 Hyd and VolcMiner D1 Hydro.
With 12 intelligent high-efficiency fans, the AP-M2 dynamically adjusts airflow to maintain optimal thermal management, ensuring stable 24/7 water-cooled mining. This advanced water cooling radiator helps mining farms enhance uptime, improve performance, and maintain efficient, low-noise operations.
Specifications
| Product Model | AP-M2 |
| Heat dissipation | 12kW Hydro Cooling Unit |
| Operating Temperature Guidelines | 32°C: Supports 2 Antminers |
| Whatsminer: Only supports 1 unit regardless of temperature. If the ambient temperature exceeds the recommended range, 1 unit can still be safely operated. | |
| Miners Capacity | 2* Antminer T19 S19 S21 Hyd. |
| Product Size | 56*45*15.1CM |
| Gross Weight | 22KG |
| Power Consumption | 130-200W |
| Working Noise | 30-70 dB |
| Fan Speed | 0-4500 rpm |
| Cooling Medium | Pure Water/Coolant |
| Temperature Control Only | Automatic Speed Adjustment |
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1–2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3–7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5–8 business days, with remote locations potentially requiring 8–10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
Want to Explore Similar Mining Options?
Explore All Asics ››| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Antminer S23e Hyd 2U |
|
$19,030.00 – $19,030.00 | 865Th/s | 8650W | 10.00J/TH | SHA-256 | 38 Mon | $16.50 /day |
| Antminer S21 XP Hydro |
|
$1,027.00 | 473Th/s | 5670W | 11.99J/TH | SHA-256 | 4 Mon | $7.90 /day |
| WhatsMiner M73 |
|
$4,885.00 – $4,885.00 | 526Th/s | 7630W | 14.51J/TH | SHA-256 | 23 Mon | $7.19 /day |
| Antminer S21e Hydro |
|
$1,436.00 – $1,680.00 | 310Th/s | 5270W | 17.00J/TH | SHA-256 | 14 Mon | $3.31 /day |
| Antminer S19 XP+ Hyd |
|
$905.00 – $1,120.00 | 293Th/s | 5567W | 19.00J/TH | SHA-256 | 12 Mon | $2.43 /day |
Customer FAQs
Consider your hash rate, miner compatibility, available space, electrical capacity, and future scalability when selecting liquid cooling equipment.
Not sure what to choose? Contact MiningUS for a custom solution based on your miner models, quantity, available power, and deployment requirements.
Liquid cooling systems are generally quiet due to reduced fan usage, making them ideal for home mining setups, garages, workshops, or office environments. Under high load, some noise from circulation pumps and external cooling equipment may still be noticeable.
Most liquid cooling systems require a specialized coolant for efficient heat transfer and long-term corrosion protection. Depending on the system, this may include treated water, deionized water, glycol-based coolant, or another approved cooling medium.
Installation is straightforward but requires correct electrical connections, piping, coolant filling, and heat-rejection setup. Detailed guidance can be provided to help with installation.
For larger projects, remote technical assistance and site-specific installation planning can also be arranged.
Yes. Regular maintenance is recommended, including checking coolant quality and level, system pressure, pumps, pipes, valves, hoses, manifolds, filters, dry coolers, and all connections for leaks or scale buildup.
Yes. Some systems can recover mining heat for applications such as radiators, underfloor heating, hot water, greenhouses, or swimming pools, allowing mining-generated heat to be reused instead of wasted.
Special pricing may be available for bulk orders, larger mining projects, repeat customers, and selected promotions.
Join the official MiningUS Telegram or WhatsApp community for new inventory, promotions, and special offers.
Yes, but always verify the representative and payment instructions before sending funds.
- Verify the representative: use the official MiningUS authentication page: miningus.io/authentication/
- CEO: KEN KILSON — +1 (224) 412-6087
- Confirm Telegram and WhatsApp communication using only the official MiningUS channels.
- Never send cryptocurrency or bank payments to details that have not been verified through an official MiningUS channel.
- Keep your invoice, payment receipt, correspondence, and cryptocurrency transaction ID where applicable.
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.