1MW 200-Slot Immersion Cooling B100 Cluster for Antminer & Whatsminer

Price range: $141,450.00 through $148,000.00

✓ 1 Year Warranty

The B100 Cluster combines 10 B100 tanks in a 1MW immersion cooling system for up to 200 ASIC miners. Choose the CE or UL configuration, each paired with a 1200kW dry cooler, for modular large-scale deployment.

Need Customization?

Complete your order and payment first. Immediately after payment, visit our Order Customization page and submit the form with your customization requirements.

Description

Product Description

The B100 Cluster combines ten B100 tanks into a modular 1MW immersion cooling system for up to 200 ASIC miners. Built for large-scale deployment, the skid-mounted design brings tanks, circulation equipment, monitoring and electrical distribution together for faster installation.

Choose the CE or UL B100 Cluster configuration, each paired with a 1200kW dry cooler. The system supports single-loop or dual-loop circulation and a 7000L coolant volume.

Modular Design · Cost-Efficient · Fast Deployment

B100 Cluster skid-mounted immersion cooling system and dry coolerB100 Cluster components: immersion tank, CDU, dry cooler, electrical panel, monitoring and skid

System Features

Immersion Tanks

Refined tanks integrate circulation pumps and smart PDUs with individual breakers.

Cooling Distribution Unit

The primary CDU connects the dry cooler and ring piping with automatic adjustment.

Dry Cooler

An outdoor closed-loop cooling system supports operation in high ambient temperatures.

Electrical Panel

An integrated three-phase electrical system supports the selected site configuration.

Monitoring

Tank displays provide status information, with a web-based portal and API availability.

Skid-Mounted Design

All components are mounted on a skid to simplify shipping and deployment.

Product Details & Deployment

B100 tank power connections
Tank power connections
ASIC miner installation inside a B100 tank
Miner installation
B100 Cluster tanks and electrical cabinet
Tanks and electrical cabinet
Full B100 Cluster factory deployment
Full cluster deployment

Specifications

ModelB100 Cluster
Dimensions11800mm(L) * 2200mm(W) * 2350mm(H)
Miner Capacity200
Numbers of Tank10 * B100 Tank (New design)
Cooling Capacity1MW
Circulation ModeSingle Loop / Dual Loop
Coolant Volume7000L
Cooling TypeDry Cooler
Input Voltage3-phase 350-480V 50/60Hz
Max Power Load1437kW
Operating Power100kW
Max Inlet/Outlet Temp48/56°C
Ambient Temperature-25°C~48°C
MonitoringTank-level mini-LED; web-based portal for remote control; standard SNMP protocol and email integration

Shipping & Delivery

Large cooling systems are generally transported by sea freight. Contact MiningUS with your delivery address to confirm freight costs, port arrangements and site unloading requirements before ordering.

Want to Explore Similar Mining Options?

Explore All Asics >>
ModelsCoinsMeilleur PriceHashratePowerElectricityAlgorithmROIProfit
Antminer S21 XP IMMBCH · BSV · BTC$4,020.00 - $4,020.00300Th/s4050W13.50J/THSHA-25620 Mon$ 6.58 /day
Antminer S21 XPBCH · BSV · BTC$3,480.00270Th/s3650W13.52J/THSHA-25620 Mon$ 5.92 /day
Antminer S21 Pro+BCH · BTC$1,760.00 - $2,045.00234Th3510W15.00J/THSHA-25612 Mon$ 4.71 /day
Antminer S21 Imm.BCH · BSV · BTC$1,625.00 - $1,625.00215Th/s3440W16.00J/THSHA-25613 Mon$ 4.07 /day
Antminer T21BCH · BSV · BTC$2,350.00190Th/s3610W19.00J/THSHA-25627 Mon$ 2.91 /day

Swipe horizontally to view all specifications →

Illustrative comparison figures; prices, daily profit and payback are reference estimates, not live quotes or guaranteed returns. Results vary with electricity rates, network conditions and coin prices. Check the shop for current pricing.

Customer FAQs

How do I choose the right immersion cooling equipment?

Consider miner compatibility, total heat load, available space, electrical supply and future expansion. The B100 Cluster supports up to 200 miners in ten tanks.

What configurations are available?

Choose CE- B100 Cluster +1200kW Drycooler or UL- B100 Cluster +1200kW Drycooler. Confirm the applicable electrical configuration and documentation for your destination.

Do I need a specific coolant?

Use a compatible dielectric immersion coolant approved for the miners and cooling system. The specification lists a coolant volume of 7000L; confirm whether coolant is included in your order.

Is immersion cooling noisy?

Immersion cooling reduces reliance on miner fans, but circulation pumps and the external dry cooler still produce operating noise.

Is installation complicated?

The skid-mounted design simplifies deployment. Site power, piping, coolant filling and commissioning should be planned for the final configuration.

Does the cooling system need maintenance?

Regularly check coolant level and condition, connections, pumps, the dry cooler and monitoring alerts according to the equipment instructions.

Can the recovered heat be used?

Heat reuse depends on the site’s heating demand and a suitable heat-exchange design. Discuss integration requirements with MiningUS.

What warranty is listed?

The supplier lists a one-year warranty. Contact MiningUS to confirm coverage and service terms.

Can I request bulk pricing or customization?

Contact MiningUS for quantity pricing, layout requirements and delivery planning.

How can I verify MiningUS contact details?

Use our authentication page, Telegram or WhatsApp.

Additional information
SpecificationCE- B100 Cluster +1200kW Drycooler, UL- B100 Cluster +1200kW Drycooler
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “1MW 200-Slot Immersion Cooling B100 Cluster for Antminer & Whatsminer”

Your email address will not be published. Required fields are marked *

Shipping and Delivery

Delivery costs shown before payment

Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.

Miners and spare parts

Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.

Cooling systems and heavy equipment

Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.

Customs and delivery support

Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.

Read the full shipping policy  |  Contact Mining US

Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.