MiningUS AP-HC40-A364 2.1MW 364-slot Antminer hydro cooling container
2.1MW 364-Slot Antminer Hydro Mining Container (40HQ) Price range: $138,000.00 through $148,000.00
Back to products
AP-HC40-A420 2.4 MW 420-slot Antminer hydro cooling container
2.4MW 420-Slot Antminer Hydro Cooling Container (40HQ) Price range: $103,500.00 through $147,800.00

Bitdeer SEALMINER A2 Hyd 446TH/S 7360W Bitcoin Miner

$7,495.00

✓ Manufacturer Warranty   ✓ PSU Included

Bitdeer SEALMINER A2 Hyd hydro-cooled SHA-256 miner rated at 446 TH/s and approximately 7360W, with 16.5 J/TH efficiency. Requires compatible liquid cooling and 380–480V three-phase power.

Categories: , Tags: , , ,
Description

Product Description

The Bitdeer SEALMINER A2 Hyd is a hydro-cooled SHA-256 miner rated at 446 TH/s and approximately 7360W, with 16.5 J/TH efficiency. Its rack-mount format and liquid cooling system are designed for large-scale Bitcoin mining deployments.

This listing is for the 446 TH/s configuration. The supplier specification table describes the broader 440–490 TH/s series and lists nominal consumption as 7359W.

Specifications

CATEGORY ITEM SPECIFICATION
Key Specifications Crypto Algorithm | Coins SHA256 | BTC/BCH/BSV
Hash Rate, TH/s 440–490
Power Efficiency @35°C, J/TH 16.5 ± 5%
Power Consumption @35°C, W 7,359 ± 10%
Power Supply Requirements Maximum Input Power of Power Supply, W 10,000
Input Voltage, VAC 380–480, 3-Phase
Maximum Input Current, Amp 20
Input Frequency Range, Hz 47–63
Hardware Configuration Product Dimensions (W×D×H), mm 482 × 665 × 88
Packaging Dimensions (W×D×H), mm 567 × 787 × 248
Product Net Weight, kg 20.5
Gross Weight Including Packaging, kg 23
Internet Connections RJ45 Ethernet 10/100M
Environmental Operating Parameters Inlet Liquid Temperature, °C 20–55
Operating Humidity (Non-Condensing), RH 10%–90%
Storage Temperature, °C -30–70
Liquid Operating Parameters Liquid Pressure, bar ≤3.5
Liquid Medium Pure water (or distilled water) + special corrosion inhibitor or antifreeze (select the ratio according to the freezing point)
Liquid Flow, L/min ≥10.2 L/min for pure water; if antifreeze is used (e.g., 30% ethylene glycol aqueous solution), ≥11 L/min. Note: 10.2 L/min corresponds to ~10.5°C temperature difference between inlet and outlet water in normal mode.

Cooling & Installation

Requires a compatible external liquid cooling system and 380–480V three-phase power. The supplier specifies at least 10.2L/min flow with pure water or 11L/min with a 30% ethylene glycol solution, liquid pressure ≤3.5bar and inlet temperature 20–55°C. Use the specified corrosion inhibitor or antifreeze mixture for the installation conditions.

Warranty & Setup

Manufacturer Warranty and PSU Included are listed by the supplier. Contact MiningUS to confirm warranty duration, cooling-system compatibility and installation requirements.

Want to Explore Similar Mining Options?

Explore All Asics >>

Models Coins Meilleur Price Hashrate Power Electricity Algorithm ROI Profit
WhatsMiner M63S++ BCH, BSV, BTC $3,899.00 – $3,899.00 424Th/s 6572W 15.50J/TH SHA-256 16 Mon $ 8.30 /day
WhatsMiner M63S+ BCH, BSV, BTC $2,920.00 – $2,920.00 450th/s 7650W 17.00J/TH SHA-256 12 Mon $ 8.00 /day
SEALMINER A4 Pro Air BCH, BSV, BTC $3,950.00 336Th/s 3662W 10.90J/TH SHA-256 16 Mon $ 8.43 /day
Antminer S23 BCH, BSV, BTC $7,150.00 318Th/s 3498W 11.00J/TH SHA-256 30 Mon $ 7.94 /day
Avalon A1566HA 2U BCH, BSV, BTC $3,398.00 – $4,195.00 480TH/s 8064W 16.80J/TH SHA-256 13 Mon $ 8.64 /day

Supplier-listed estimates at the time of update; prices and profitability change.

Additional information
Specification446 TH/s, 7360W, Hydro cooling
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Bitdeer SEALMINER A2 Hyd 446TH/S 7360W Bitcoin Miner”

Your email address will not be published. Required fields are marked *

Shipping and Delivery

Delivery costs shown before payment

Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.

Miners and spare parts

Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.

Cooling systems and heavy equipment

Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.

Customs and delivery support

Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.