154-Slot 870kW Antminer Liquid Cooling Rack
$4,999.00
AP-A154 hydro cooling rack for up to 154 compatible Antminer S19, S21 or S23 Hydro miners. Marketed as an 870 kW system; the detailed specification lists 847 kW installed load. Confirm the final system rating with your project quote.
Complete your order and payment first. Immediately after payment, visit our Order Customization page and submit the form with your customization requirements.
870kW 154-Slot Antminer Liquid Cooling Rack for High-Density Indoor Mining
⚙ Compatible Models
View More ›293 TH/s · 19 J/TH
154 SlotsFull-load reference: $1,710.94/day➜Antminer S21 XP Hydro473 TH/s · 12 J/TH
154 SlotsFull-load reference: $2,761.22/day➜Antminer S21+ Hydro358 TH/s · 15 J/TH
154 SlotsFull-load reference: $2,089.78/day➜Antminer S21e Hydro310 TH/s · 17 J/TH
154 SlotsFull-load reference: $1,809.50/day➜Antminer S23 Hyd580 TH/s · 9.5 J/TH
154 SlotsFull-load reference: $3,386.46/daySupplier reference estimates, not live or guaranteed earnings. Actual results vary with miner settings, network conditions, coin prices and electricity costs.
Product Description
The AP-A154 is an indoor hydro cooling rack for up to 154 compatible Antminer S19, S21 and S23 Hydro miners. Its open-frame structure combines miner mounting, coolant distribution, pump circulation and centralized controls for industrial mining sites.
The product is marketed as 870 kW, while the detailed table lists 847 kW installed power load. Confirm the final thermal rating, miner load limit and auxiliary power requirements in the project quotation.
Core Advantages
Integrated open-frame system

Open-frame layout with 154 server positions, integrated CDU and central controls.
Quick-connect fittings

Hoses and quick connectors support individual miner connections and maintenance.
Stainless steel CDU piping

Manifolds distribute coolant through the system.
Leak detection

A moisture-sensing rope detects coolant leaks and triggers an alarm.
Central power cabinet

The listed configuration includes a 630 A RCCB and 125 A MCCB.
Touchscreen management

Monitor voltage, pump VFD frequency and alarm history.
Full Specifications
| Model | AP-A154 |
|---|---|
| Installed capacity | 154 miner positions |
| Marketed system rating | 870 kW |
| Installed power load in detailed table | 847 kW |
| External dimensions (L × W × H) | 4880 × 1500 × 2700 mm |
| Internal dimensions as listed | 4880 × 1500 × 2700 mm |
| Weight | 3500 kg |
| Power input | 380–415 V AC, 50/60 Hz |
| Vertical multistage pump | 15 kW |
| Fluid replenishing pump | 0.2 kW |
| Dry cooling tower fans | 41.5 kW |
| Closed cooling tower fans | 13.2 kW |
| Closed cooling tower spray pump | 3 kW |
| Pipeline pressure | 0.2–0.4 MPa |
| System operating temperature | 22–42°C |
| Coolant circulation per miner | ≥0.5 m³/h |
| System coolant volume requirement | ≥1.6 m³ |
| Molded case circuit breaker | 125 A |
| Residual current circuit breaker | 630 A |
| Contactor | 9 A |
| Intermediate relay | 24 V |
| Frequency converter | 380 V |
Dry cooler and closed cooling tower power figures refer to different configurations. Auxiliary equipment power is additional to the miner load. Confirm final electrical design and equipment scope before deployment.
Project planning and delivery
Provide the delivery location, miner models, available electrical supply and project timeline for a configuration and freight quote. The supplier indicates a typical 45-day lead time; confirm availability and DDP sea shipping for your destination.
Contact MiningUS on Telegram · WhatsApp · Verify official contacts
Frequently asked questions
Can I mix Antminer Hydro generations?
The rack is listed for compatible S19, S21 and S23 Hydro models. Confirm model dimensions, coolant requirements and the combined load for a mixed deployment.
Is the system rated at 870 kW or 847 kW?
The title and overview state 870 kW; the detailed installed-load table states 847 kW. Confirm the final rated capacity and permitted miner load in your project quote.
How are coolant leaks detected?
A moisture-sensing rope monitors for leaks and triggers an alarm. Regular inspection and maintenance are still required.
Can multiple racks share cooling equipment?
A shared external cooling system must be sized for the combined thermal load, flow, pressure and site conditions. Request a project-specific design.
What maintenance should be planned?
Follow the supplied service schedule for coolant quality, filters, pumps, connections, sensors and electrical equipment. The final configuration determines maintenance intervals.
What warranty is included?
Confirm warranty coverage and duration in the project quotation. No fixed duration is stated on this source listing.
Want to Explore Similar Mining Options?
Explore All ASICs ››| Models | Coins | Reference Price | Hashrate | Power | Efficiency | Algorithm | Est. Payback | Est. Profit |
|---|---|---|---|---|---|---|---|---|
| Antminer S21 XP Hydro | BCH · BSV · BTC | $6,140.00 | 473 TH/s | 5,670 W | 11.99 J/TH | SHA-256 | 18 months | $11.23 /day |
| Antminer S21+ Hydro | BCH · BSV · BTC | $2,195.00–$2,645.00 | 358 TH/s | 5,370 W | 15.00 J/TH | SHA-256 | 10 months | $7.21 /day |
| Whatsminer M63S | BCH · BSV · BTC | $2,720.00 | 390 TH/s | 7,215 W | 18.50 J/TH | SHA-256 | 15 months | $6.21 /day |
| Antminer S19 XP+ Hyd | BCH · BSV · BTC | $1,150.00 | 293 TH/s | 5,567 W | 19.00 J/TH | SHA-256 | 9 months | $4.49 /day |
| Antminer S19e XP Hyd | BCH · BSV · BTC | $750.00 | 251 TH/s | 5,522 W | 22.00 J/TH | SHA-256 | 8 months | $2.95 /day |
Swipe horizontally to view all specifications →
Illustrative comparison figures; prices, daily profit and payback are reference estimates, not live quotes or guaranteed returns. Results vary with electricity rates, network conditions and coin prices. Check the shop for current pricing.
| Rack capacity | 154 Antminer Hydro miners |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.