Used Goldshell KD BOX 1.6T 205W KDA Miner Home Mining

$355.00

Used · No warranty

Used Goldshell KD-BOX for Kadena mining, rated at 1.6 TH/s and 205 W. Compact enclosure with two fans, Ethernet and a supplier-listed noise level of 35 dB.

Categories: , Tag:
Description

Want to Explore Similar Mining Options?

Explore All Asics >>

Models Coins Meilleur Price Hashrate Power Electricity Algorithm ROI Profit
Goldshell KD BOX Pro KDA $385.00 2.6Th/s 230W 88.46J/TH Kadena Never $ -0.22 /day
iBelink BM-K3 Mini KDA $288.00 5Th/s 290W 58.00J/TH Kadena Never $ -0.24 /day
Goldshell KD BOX II KDA $270.00 5Th/s 400W 80.00J/TH Kadena Never $ -0.37 /day
iBeLink BM K3 Max KDA $750.00 82Th/s 3200W 39.02J/TH Kadena Never $ -2.00 /day
Goldshell KD LITE KDA $890.00 16.2Th/s 1330W 82.10J/TH Kadena Never $ -1.23 /day

Supplier-listed estimates at the time of update; prices and profitability change.

Used Goldshell KD-BOX

Used Goldshell KD-BOX for Kadena mining, rated at 1.6 TH/s and 205 W. Compact enclosure with two fans, Ethernet and a supplier-listed noise level of 35 dB.

Specifications

Hashrate 1.6 TH/s
Algorithm Kadena
Manufacturer Goldshell
Model KD-BOX
Also known as KDA-BOX
Release May 2021
Size 150 x 180 x 85mm
Noise level 35db
Fan(s) 2
Power 205W
Voltage 12V
Interface Ethernet
Temperature 5 – 45 °C
Humidity 5 – 95 %
Condition Used
Warranty No warranty
Power supply Included
Additional information
Hash Rate1.6 TH/s
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Used Goldshell KD BOX 1.6T 205W KDA Miner Home Mining”

Your email address will not be published. Required fields are marked *

Shipping and Delivery

Delivery costs shown before payment

Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.

Miners and spare parts

Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.

Cooling systems and heavy equipment

Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.

Customs and delivery support

Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.

Read the full shipping policy  |  Contact Mining US

Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.