iBeLink BM-K1+ 15 TH/s 2250W Kadena Miner with Power Supply
$1,020.00
✓ Manufacturer Warranty ✓ PSU Included
iBeLink BM-K1+ delivers 15 TH/s at 2250 W for Kadena mining. It supports mainstream Stratum mining pools, a web interface for setup and real-time mining-status monitoring, with an included power supply.
iBeLink BM-K1+ 15 TH/s 2250W Kadena Miner with Power Supply
iBeLink BM-K1+ delivers 15 TH/s at 2250 W for Kadena mining. It supports mainstream Stratum mining pools, a web interface for setup and real-time mining-status monitoring, with an included power supply.
Specifications
| Manufacturer | iBeLink |
|---|---|
| Algorithm / coins | Blake2s-Kadena / Kadena (KDA) |
| Hashrate | 15 TH/s |
| Power | 2250 W |
| Release | September 2021 |
| Dimensions | 128 × 201 × 402 mm |
| Weight | 6.6 kg |
| Noise | 74 dB |
| Fans | 2 |
| Miner DC supply | 12 V |
| Temperature | 5–40 °C |
| Humidity | 5–95% |
| Network | Ethernet |
| Power supply | Included |
| Warranty | Manufacturer warranty |
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Goldshell KD6 SE | KDA | $1,016.00 | 25.3Th/s | 2300W | 90.91J/TH | Kadena | Never | $ -2.19 /day |
| Goldshell KD6 | KDA | $1,027.00 | 29.2Th/s | 2560W | 87.67J/TH | Kadena | Never | $ -2.42 /day |
| Goldshell KD Lite+ | KDA | $950.00 | 16.2Th/s | 1150W | 70.99J/TH | Kadena | Never | $ -1.02 /day |
| Goldshell KD5 PRO | KDA | $899.00 | 24.5Th/s | 3000W | 122.45J/TH | Kadena | Never | $ -3.05 /day |
| Goldshell KD LITE | KDA | $890.00 | 16.2Th/s | 1330W | 82.10J/TH | Kadena | Never | $ -1.23 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Hashrate | 15 TH/s |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.