Goldshell AE BOX II 54Mh/s 530W ALEO Miner
$160.00
✓ Manufacturer Warranty PSU Not Included
Goldshell AE BOX II is an ASIC miner for Aleo using the zkSNARK algorithm, rated at 54 MH/s and 530 W. Its compact enclosure supports Ethernet and Wi-Fi connectivity. A compatible PSU is not included.
Goldshell AE BOX II Aleo Miner
Goldshell AE BOX II is an ASIC miner for Aleo using the zkSNARK algorithm, rated at 54 MH/s and 530 W. Its compact enclosure supports Ethernet and Wi-Fi connectivity. A compatible PSU is not included.
Specifications
| Manufacturer | Goldshell |
|---|---|
| Model | AE-BOX II |
| Also known as | Goldshell AE-BOX II ALEO Miner |
| Release | March 2025 |
| Size | 198 x 150 x 95mm |
| Weight | 2600g |
| Noise level | 35db |
| Hashrate | 54Mh/s |
| Power | 530W |
| Voltage | 110~240V |
| Interface | Ethernet / Wifi |
| Temperature | 5 – 45 °C |
| Humidity | 5 – 65 % |
| Algorithm | zkSNARK |
| Power supply | Not included |
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Goldshell AE BOX | ALEO | $160.00 | 37Mh/s | 360W | 9.73J/MH | zkSNARK | Never | $ -0.36 /day |
| IceRiver ALEO AE0 | ALEO | $240.00 | 60Mh/s | 100W | 1.67J/MH | zkSNARK | Never | $ -0.01 /day |
| Goldshell AE BOX Pro | ALEO | $260.00 | 44Mh/s | 460W | 10.45J/MH | zkSNARK | Never | $ -0.47 /day |
| Goldshell E-AE1M | ALEO | $660.00 | 230Mh/s | 2000W | 8.70J/MH | zkSNARK | Never | $ -1.97 /day |
| IceRiver AE2 | ALEO | $750.00 – $750.00 | 720Mh/s | 1300W | 1.81J/MH | zkSNARK | Never | $ -0.22 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Hashrate | 54 MH/s |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.