Goldshell 1500W PSU
$208.00
✓ Manufacturer Warranty
1500 W PSU for compatible Goldshell BOX miners. Supports the supplier-listed 6-pin connection layouts within its rated power capacity.
Goldshell 1500W Power Supply
Power supply for compatible Goldshell BOX-series miners, including AL-BOX II, AL-BOX, CK-BOX, LB-BOX, HS-BOX, Mini-Doge and KD-BOX. Check each miner’s connector requirements and combined power demand before connecting multiple units.
Supported connection layouts
| Three 6-pin connections per miner | 2 BOX miners |
|---|---|
| Two 6-pin connections per miner | 3 BOX miners |
| One 6-pin connection per miner | 6 BOX miners |
These are supplier-listed connector layouts; total load must stay within the PSU rating. Fully seat every required connector.
Specifications
| Model | Goldshell 1500W PSU |
|---|---|
| Rated power | 1500 W |
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| IceRiver ALEO AE0 | ALEO | $240.00 | 60Mh/s | 100W | 1.67J/MH | zkSNARK | Never | $ -0.01 /day |
| Goldshell MINI DOGE III | DOGE, LTC, BEL | $320.00 – $320.00 | 650Mh/s | 400W | 0.62J/MH | Scrypt | Never | $ -0.23 /day |
| Goldshell Mini Doge III Plus | DOGE, LTC, BEL | $430.00 | 810Mh/s | 500W | 0.62J/MH | Scrypt | Never | $ -0.29 /day |
| Goldshell AE BOX | ALEO | $160.00 | 37Mh/s | 360W | 9.73J/MH | zkSNARK | Never | $ -0.36 /day |
| Goldshell AE BOX Pro | ALEO | $260.00 | 44Mh/s | 460W | 10.45J/MH | zkSNARK | Never | $ -0.47 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Rated Power | 1500 W |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.