Elphapex DG2 18G 3960W Dogecoin Litcoin Bells Miner

$4,675.00

✓ Manufacturer Warranty   PSU Not Included

Scrypt ASIC rated at 18 GH/s and 3,960 W for Dogecoin, Litecoin and Bells mining. The rated figures give 0.22 J/MH efficiency. A compatible power supply is not included.

Description

ElphaPex DG2

Scrypt ASIC rated at 18 GH/s and 3,960 W for Dogecoin, Litecoin and Bells mining. The rated figures give 0.22 J/MH efficiency. A compatible power supply is not included.

Specifications

Manufacturer ElphaPex
Model DG2
Also known as DG2 Scrypt Miner
Release Jun 2025
Size 369 x 196 x 287mm
Weight 16500g
Noise level 75dB
Fan(s) 4
Hashrate 18Gh/s
Power 3960W
Voltage 200-240V
Interface Ethernet
Temperature 5 – 45 °C
Humidity 5 – 95 %
Algorithm Scrypt
Calculated nominal efficiency 0.22 J/MH (3,960 W ÷ 18,000 MH/s)
Power supply Not included

The supplier description also states 0.19 J/MH, which conflicts with its listed power and hashrate; 0.22 J/MH is calculated from the rated figures.

Want to Explore Similar Mining Options?

Explore All Asics >>

Models Coins Meilleur Price Hashrate Power Electricity Algorithm ROI Profit
Antminer L9 DOGE, LTC, BEL $2,500.00 – $2,900.00 16Gh/s 3360W 210.00J/GH Scrypt 40 Mon $ 2.07 /day
Fluminer L3 DOGE, LTC, BEL $2,900.00 9.5Gh/s 1700W 178.95J/GH Scrypt 61 Mon $ 1.58 /day
Elphapex DG2+ DOGE, LTC, BEL $7,998.00 20.5Gh/s 3900W 190.24J/GH Scrypt 85 Mon $ 3.14 /day
VOLCMINER D1 Pro DOGE, LTC, BEL $5,774.00 20Gh/s 3700W 185.00J/GH Scrypt 60 Mon $ 3.19 /day
Antminer L11 DOGE, LTC, BEL $4,750.00 20Gh/s 3680W 184.00J/GH Scrypt 49 Mon $ 3.21 /day

Supplier-listed estimates at the time of update; prices and profitability change.

Additional information
Hashrate18 GH/s
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “Elphapex DG2 18G 3960W Dogecoin Litcoin Bells Miner”

Your email address will not be published. Required fields are marked *

Shipping and Delivery

Delivery costs shown before payment

Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.

Miners and spare parts

Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.

Cooling systems and heavy equipment

Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.

Customs and delivery support

Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.

Read the full shipping policy  |  Contact Mining US

Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.