Elphapex DG2 18G 3960W Dogecoin Litcoin Bells Miner
$4,675.00
✓ Manufacturer Warranty PSU Not Included
Scrypt ASIC rated at 18 GH/s and 3,960 W for Dogecoin, Litecoin and Bells mining. The rated figures give 0.22 J/MH efficiency. A compatible power supply is not included.
ElphaPex DG2
Scrypt ASIC rated at 18 GH/s and 3,960 W for Dogecoin, Litecoin and Bells mining. The rated figures give 0.22 J/MH efficiency. A compatible power supply is not included.
Specifications
| Manufacturer | ElphaPex |
|---|---|
| Model | DG2 |
| Also known as | DG2 Scrypt Miner |
| Release | Jun 2025 |
| Size | 369 x 196 x 287mm |
| Weight | 16500g |
| Noise level | 75dB |
| Fan(s) | 4 |
| Hashrate | 18Gh/s |
| Power | 3960W |
| Voltage | 200-240V |
| Interface | Ethernet |
| Temperature | 5 – 45 °C |
| Humidity | 5 – 95 % |
| Algorithm | Scrypt |
| Calculated nominal efficiency | 0.22 J/MH (3,960 W ÷ 18,000 MH/s) |
| Power supply | Not included |
The supplier description also states 0.19 J/MH, which conflicts with its listed power and hashrate; 0.22 J/MH is calculated from the rated figures.
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Antminer L9 | DOGE, LTC, BEL | $2,500.00 – $2,900.00 | 16Gh/s | 3360W | 210.00J/GH | Scrypt | 40 Mon | $ 2.07 /day |
| Fluminer L3 | DOGE, LTC, BEL | $2,900.00 | 9.5Gh/s | 1700W | 178.95J/GH | Scrypt | 61 Mon | $ 1.58 /day |
| Elphapex DG2+ | DOGE, LTC, BEL | $7,998.00 | 20.5Gh/s | 3900W | 190.24J/GH | Scrypt | 85 Mon | $ 3.14 /day |
| VOLCMINER D1 Pro | DOGE, LTC, BEL | $5,774.00 | 20Gh/s | 3700W | 185.00J/GH | Scrypt | 60 Mon | $ 3.19 /day |
| Antminer L11 | DOGE, LTC, BEL | $4,750.00 | 20Gh/s | 3680W | 184.00J/GH | Scrypt | 49 Mon | $ 3.21 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Hashrate | 18 GH/s |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.