ElphaPex DG Hydro 1 20Gh/s 6200W Litcoin Dogecoin Bells Miner
$4,630.00
✓ Manufacturer Warranty ✓ PSU Included
Hydro-cooled Scrypt miner rated at 20 GH/s and 6,200 W, with 0.31 J/MH nominal efficiency. Designed for compatible Dogecoin, Litecoin and Bells mining. Its 380–480 V AC supply and hydro cooling require a suitable electrical and cooling installation.
ElphaPex DG Hydro 1
Hydro-cooled Scrypt miner rated at 20 GH/s and 6,200 W, with 0.31 J/MH nominal efficiency. Designed for compatible Dogecoin, Litecoin and Bells mining. Its 380–480 V AC supply and hydro cooling require a suitable electrical and cooling installation.
Specifications
| Manufacturer | ElphaPex |
|---|---|
| Model | DG Hydro 1 |
| Also known as | DG Hydro 1 (20Gh/s) |
| Release | Feb 2025 |
| Size | 656 x 447 x 86mm |
| Weight | 25000g |
| Noise level | 50db |
| Cooling | Hydro cooling (1L) |
| Hashrate | 20Gh/s |
| Power | 6200W |
| Voltage | AC380-480V |
| Interface | Ethernet 10/100M |
| Temperature | 5 – 45 °C |
| Humidity | 5 – 95 % |
Product manual
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| VolcMiner D1 Mini Pre | DOGE, LTC, BEL | $650.00 | 2.2Gh/s | 500W | 227.27J/GH | Scrypt | 90 Mon | $ 0.24 /day |
| Elphapex DG1 Lite | DOGE, LTC, BEL | $2,359.00 | 11Gh/s | 3410W | 310.00J/GH | Scrypt | 715 Mon | $ 0.11 /day |
| Fluminer L2 | DOGE, LTC, BEL | $389.00 | 1Gh/s | 230W | 230.00J/GH | Scrypt | 118 Mon | $ 0.11 /day |
| ElphaPex DG 1S | DOGE, LTC, BEL | $2,800.00 | 10Gh/s | 3100W | 310.00J/GH | Scrypt | 933 Mon | $ 0.10 /day |
| ElphaPex DG2 Mini | DOGE, LTC, BEL | $988.00 | 2.4Gh/s | 530W | 220.83J/GH | Scrypt | 118 Mon | $ 0.28 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Hashrate | 20 GH/s |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.