BOMBAX EZ100 PRO 15500MH/s 3100W ETC Miner ZIL Mining
$9,480.00
✓ Manufacturer Warranty · PSU Included
Bombax EZ100 Pro Etchash ASIC miner with 15.5GH/s hashrate and 3100W power consumption. Designed for Ethereum Classic mining, with Ethernet connectivity and two cooling fans.
Bombax EZ100 Pro Etchash Miner
The Bombax EZ100 Pro delivers 15,500MH/s (15.5GH/s) using the Etchash algorithm at 3100W. It is designed for Ethereum Classic mining, with Ethernet connectivity and a two-fan cooling system.
The supplier also lists Zilliqa, EthereumPoW, CAU, BTN, XPB, DOGETHER, OCTA and LRS support. Availability depends on compatible firmware, pools and network requirements.
Specifications
| Algorithm | Etchash |
|---|---|
| Hashrate | 15,500MH/s / 15.5GH/s |
| Manufacturer | Bombax Miner |
| Model | EZ100 Pro |
| Also known as | Bombax Miner EZ100 Pro ETC Miner |
| Release | June 2024 |
| Weight Net | 16400g |
| Weight Gross | 17900g |
| Noise level | 80db |
| Fan(s) | 2 |
| Size w/o | 400 x 213 x 295mm |
| Size with | 523 x 300 x 388mm |
| Voltage | 200-285V |
| Power | 3100W |
| Interface | Ethernet |
| Temperature | 0 – 40 °C |
| Humidity | 0 – 90 % |
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Bombax EZ100 | ETC, ETHW, ZIL | $9,850.00 – $9,850.00 | 12.5Gh/s | 2200W | 176.00J/GH | EtHash | 85 Mon | $ 3.88 /day |
| iPollo V2 | ETC, ETHW, OCTA, XPB | $2,850.00 | 10 GH/s | 1500W | 150.00J/GH | Ethash | 28 Mon | $ 3.42 /day |
| Antminer E11 | ETC, ETHW | $2,150.00 – $2,150.00 | 9 GH/s | 2340W | 260.00J/GH | EtHash | 38 Mon | $ 1.89 /day |
| iPollo V2H | ETC, ETHW, OCTA, XPB | $1,240.00 | 3.4 GH/s | 475W | 139.71J/GH | Ethash | 34 Mon | $ 1.20 /day |
| BOMBAX EZ100-C | ETC, ETHW | $2,690.00 – $2,690.00 | 3200MH/s | 570W | 0.18J/MH | ETCHash | 91 Mon | $ 0.99 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Hashrate | 15.5GH/s |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.