Bitmain Antminer S23 296T 318T 3498W Bitcoin Miner
$4,911.00
✓ Manufacturer Warranty ✓ PSU Included
Antminer S23 air-cooled SHA-256 miner rated at 318 TH/s and 3,498 W, with 11 J/TH efficiency. Supports BTC, BCH and BSV mining.
Antminer S23 Air-Cooled Bitcoin Miner
The Bitmain Antminer S23 is an air-cooled SHA-256 ASIC miner rated at 318 TH/s with 3,498 W power consumption, equivalent to 11 J/TH. It supports Bitcoin, Bitcoin Cash and Bitcoin SV mining over an Ethernet connection.
Its fan-cooled design is intended for a suitably ventilated mining installation. Manufacturer warranty and the power supply are included.
Product Specifications
| Manufacturer / model | Bitmain / Antminer S23 |
|---|---|
| Listed configuration | 318 TH/s |
| Algorithm / coins | SHA-256 / BTC, BCH, BSV |
| Power consumption | 3,498 W |
| Energy efficiency | 11 J/TH, calculated from the listed power and hashrate |
| Cooling | Air cooling |
| Interface | Ethernet |
| Noise | 75 dB (supplier-listed) |
| Warranty | Manufacturer warranty |
| Power supply | Included |
Confirm the exact unit’s PSU input rating, installation dimensions and environmental requirements before planning the electrical supply and rack installation.
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| WhatsMiner M63S+ | BCH, BSV, BTC | $2,920.00 – $2,920.00 | 450th/s | 7650W | 17.00J/TH | SHA-256 | 12 Mon | $ 8.02 /day |
| SEALMINER A2 Hyd | BCH, BSV, BTC | $7,495.00 | 446Th/s | 7359W | 16.50J/TH | SHA-256 | 30 Mon | $ 8.22 /day |
| WhatsMiner M63S++ | BCH, BSV, BTC | $3,899.00 – $3,899.00 | 424Th/s | 6572W | 15.50J/TH | SHA-256 | 16 Mon | $ 8.32 /day |
| Whatsminer M74S+ | BCH, BSV, BTC | $4,406.00 – $4,406.00 | 324TH/s | 4050W | 12.50J/TH | SHA-256 | 20 Mon | $ 7.52 /day |
| SEALMINER A4 Pro Air | BCH, BSV, BTC | $3,950.00 | 336Th/s | 3662W | 10.90J/TH | SHA-256 | 16 Mon | $ 8.45 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Hash Rate | 318 TH/s |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.