Bitmain Antminer D9 1.77Th/s 2389W DASH Miner
$1,200.00
✓ Manufacturer Warranty ✓ PSU Included
Bitmain Antminer D9 X11 miner rated at 1.77 TH/s (1770 GH/s), approximately 2839W and 1.6 J/GH. Four-fan air cooling and Ethernet connectivity support DASH mining.
Antminer D9 Description
The Bitmain Antminer D9 is an air-cooled X11 ASIC miner rated at 1.77 TH/s (1770 GH/s), approximately 2839W and 1.6 J/GH. It is designed for DASH and compatible X11 mining.
Its four-fan cooling system, Ethernet connection and included PSU support continuous operation in a ventilated mining environment. Manufacturer warranty applies, with no duration stated on the supplier page.
The supplier’s single batch entry is “1770G Mix One week”; it describes fulfillment timing rather than a separate hardware configuration.
Specifications
| Manufacturer | Bitmain |
|---|---|
| Model | Antminer D9 (1770G / 1.77Th/s) |
| Release Date | February 2023 |
| Algorithm | X11 |
| Minable Coins | DASH, BLOCX, etc. |
| Hashrate | 1.77 Th/s ± 3% (1,770 Gh/s) |
| Power Consumption | 2839 W ± 5% |
| Power Efficiency | 1.6 J/Gh |
| Dimensions | 195 x 290 x 430 mm |
| Net Weight | 16.1 kg (35.5 lbs) |
| Noise Level | 75 dB |
| Cooling | 4 x 12038 Fans |
| Interface | Ethernet (RJ45) |
| Operating Temperature | 5°C – 40°C |
| Operating Humidity | 10% – 90% (Non-condensing) |
The existing product title says 2389W, while the supplier description, specification table and main image consistently show 2839W. This page uses 2839W in the technical details and preserves the existing product name.
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Antminer D7 | BLOCX, DASH | $2,595.00 | 1.157Th/s | 3148W | 2,720.83J/TH | X11 | 27 Mon | $ 3.18 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Specification | 1.77 TH/s, 2839W, X11, Air cooling |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.