Bitdeer SealMiner A3 Hyd 500 TH/s 6750 W Bitcoin Miner
$6,750.00
✓ Manufacturer Warranty ✓ PSU Included
Bitdeer SEALMINER A3 Hyd 2U SHA-256 miner rated at 500 TH/s and 6750W, with 13.5 J/TH efficiency. Requires compatible liquid cooling and 380–480V three-phase power.
Product Description
The Bitdeer SEALMINER A3 Hyd is a 2U hydro-cooled SHA-256 miner rated at a standard 500 TH/s and 6750W, with 13.5 J/TH efficiency. Its SEAL03 chips and liquid cooling system support scalable Bitcoin mining deployments.
The supplier specification table describes a broader 460–540 TH/s range and 6210–7290W consumption. Its current 500T Mix batch carries an estimated one-week lead time; confirm exact batch performance and dispatch timing before ordering.
Specifications
| Manufacturer | Bitdeer SEALMINER A3 Hyd |
|---|---|
| Crypto Algorithm | Coins | SHA256 | BTC/BCH/BSV |
| Hash Rate | 460~540TH/s ±10% |
| Power Efficiency @35℃ | 13.5J/TH ± 5% |
| Power Consumption @35℃ | 6210~7290W ±10% |
| Power Supply Requirements | |
| Maximum Input Power Of Power Supply | 10000W |
| Input Voltage | 380~480 VAC, 3-Phase |
| Maximum Input Current | 20 Amp |
| Input Frequency Range | 47~63 Hz |
| Hardware Confguration | |
| Product Dimensions, W*D*H | 482*665*86 mm |
| Packaging Dimensions, W*D*H | 567*787*248 mm |
| Product Net Weight | 20.5 kg |
| Gross Weight Including Packaging | 23 kg |
| Internet Connections | RJ45 Ethernet 10/100M |
| Environmental Operating Parameters | |
| Inlet Liquid Temperature | 20~55 °C¹ |
| Operating Humidity (Non-Condensing) | 10%~90% RH |
| Storage Temperature | -30~70 °C² |
| Liquid Operating Parameters | |
| Liquid Pressure | ≤3.5 bar |
| Liquid Medium | Pure water (or distilled water) + special corrosion inhibitor or antifreeze (select the ratio according to the freezing Point) |
| Liquid Flow, L/min | Pure Water ≥10.2L/min for pure water; if the antifreeze needs to be changed, the flow rate needs to be increased, such as 30% ethylene glycol aqueous solution antifreeze requiring ≥11L/min. *Remarks:10.2L/min corresponds to the temperature difference between inlet and outlet water close to 10.5℃ at normal mode. |
Product Features
Supplier illustrations describe efficiency, standard hashrate, 2U installation, PSU efficiency and noise performance. Actual performance depends on delivered hardware and operating conditions; complete-system noise also depends on external cooling equipment.





Cooling & Installation
Requires 380–480V three-phase power and a compatible external liquid cooling system. The supplier lists inlet liquid temperature 20–55°C, pressure ≤3.5bar and pure-water flow ≥10.2L/min, increasing to ≥11L/min for a 30% ethylene glycol solution. Select the specified coolant additives for installation conditions.
Warranty & Setup
Manufacturer Warranty and PSU Included are listed by the supplier. Contact MiningUS to confirm warranty duration, coolant, fittings and installation requirements.
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| WhatsMiner M7AS | BCH, BSV, BTC | $0.00 | 500TH/s | 6750W | 13.50J/TH | SHA-256 | Never | $ 11.07 /day |
| WhatsMiner M73 | BCH, BSV, BTC | $4,480.00 – $4,480.00 | 526 TH/s | 7630W | 14.51J/TH | SHA-256 | 14 Mon | $ 11.01 /day |
| Antminer S21 XP Hydro | BCH, BSV, BTC | $6,140.00 | 473Th/s | 5670W | 11.99J/TH | SHA-256 | 18 Mon | $ 11.33 /day |
| Antminer S23 Immersion | BCH, BSV, BTC | $7,880.00 | 442Th/s | 5304W | 12.00J/TH | SHA-256 | 25 Mon | $ 10.58 /day |
| WhatsMiner M7D | BCH, BSV, BTC | $5,850.00 – $5,850.00 | 592TH/s | 9200W | 15.54J/TH | SHA-256 | 17 Mon | $ 11.66 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Specification | 500 TH/s, 6750W, Hydro cooling |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.