Back to products
140-Slot Natural Gas Powered Air Cooled Mining Solution for Asic Miner
140-Slot Natural Gas Powered Air Cooled Mining Solution for Asic Miner Original price was: $125,000.00.Current price is: $105,000.00.

96-Slot Natural Gas Generator Hydro Cooling Container for Antminer Hydro

$185,000.00

✓ 1 Year Warranty

AP-50Hyd container with two 250kW natural-gas generators, 96 Antminer Hydro mining slots, integrated networking and ventilation, and two micro-channel dry coolers. Combined continuous generator output: 500kW.

Category:
Description

AP-50Hyd: Natural Gas-Powered Water-Cooled Mining Solution

The AP-50Hyd combines two 250kW natural-gas generator modules with 96 Antminer Hydro mining slots, integrated networking, ventilation and micro-channel dry coolers. The modular installation combines on-site generation and liquid cooling for mining deployments.

Number of machines 96
Continuous Power 250kW x 2
Standby Power 300kW x 2
Frequency 50/60 Hz
Voltage 400V/480V
Fuel Natural Gas / Associated Gas / Coal Mine Gas / Biogas

AP-50Hyd exterior with cooling equipment

Key Features

  • Two AP-25 250kW generator modules provide 500kW combined continuous power.
  • 96 hydro miner positions with integrated power distribution and networking.
  • Two micro-channel dry coolers; the supplier overview describes 500kW thermal capacity.
  • 40HQ modular enclosure for deployment and expansion.

AP-50Hyd generator, distribution cabinet, miner racks and dry cooler layout

Specifications

Supplier specification differences: The overview lists standby power at 300kW × 2, while its graphic says emergency power 250kW × 2. Cooling is stated as 500kW in the overview and 550kW in the detailed table. The 630kW maximum load is a separate equipment rating, not the 500kW continuous generator output. Confirm the final configuration and operating conditions before site design.

AP-50Hyd Container

Size 12192*2438*2896(L*W*Hmm,±5mm)
Rack 8 Rows and 12 Columns Per Group      
Input Voltage Three-phase 380-480V 50/60Hz
Continuous power 500kW total from overview; detailed supplier row incorrectly repeats a voltage
Max Power Load 630 kW 
Ambient Temperature -25°C~35°C
Capacity 96units Antminer Hydro Miners(Support Customization)
Network 5*100M  24*bps Ethernet Switch
Cooling System Hydro Cooling
Inlet and Outlet Temp 50/60°C
Input Voltage Three-phase 350-480V 50/60Hz
Output Voltage Three-phase 350-480V 50/60Hz
Certification ETL (supplier statement)
Cooling Capacity 550kW (-30°-45°)
Input Voltage Three-phase 350-480V 50Hz/60Hz
Power Consumption 3kW *6
Noise <99dB(A)@10m

The source lists 380–480V input in one row and 350–480V in other rows, plus different temperature ranges for the container and cooler. Network notation is reproduced as supplied; verify port counts and link speed for the final build.

Generator Set

Engine Brand Geely
Engine Model AP-25
Number of Cylinders 6
Bore/Stroke 129×165 mm
Displacement 12.94 L
Compression Ratio 10.5:1
Rated Speed 1500/1800 r/min
Intake Type Turbocharged and Intercooled
Cooling Method Closed-loop forced water cooling
Lubrication Method Pressurized and splash lubrication
Oil Pressure 2.5 bar–5.8 bar
Oil Temperature ≤105°C
Oil Capacity 32 L
Firing Order 1-5-3-6-2-4
Crankshaft Rotation Counterclockwise
Fuel Intake Pressure 5 kPa

Engine and Electrical System

Brand Geely
Model HMT13F.408 30
Continuous Power 250KW
Rated Current 450A
Rated Frequency 50/60Hz
Power Factor 0.8
Starting Method DC 24V Electric Start
Speed Control Method Electronic Speed Control
Fuel Control Method Lean Burn, Closed-Loop Control
Ignition Method High-Voltage Spark Plug Ignition
Generator Set Operation Mode One-Key Auto Start
Oil Consumption Rate ≤0.3g/kWh
Noise 10 meters ≤ 101 dB(A)
NOx Emissions 1.347g/kWh
Electrical Efficiency 35%
Thermal Efficiency 47%
Electrical certification ETL (supplier statement)
Generator Set Dimensions 3100X1330X1590mm
Generator Set Weight 3140kg
Number of Phases and Connection Method Three-Phase Four-Wire, Star Connection
Cooling Method Pen-type Circulating Forced Water Cooling
Air Source Inlet Pressure 0.4Mpa
Air Source Outlet Pressure 5-10Kpa

Supplier Deployment Examples

Project photographs and figures shown on the supplier’s page. These are supplier examples, not independently verified MiningUS customer installations.

Canadian project

Canadian project

20 devices · 5MW · Natural gas

LNG power station project

LNG power station project

14 devices · 3.5MW · Landfill gas, as labeled by the supplier

Canada project

Canada project

10 devices · 3MW · Natural gas

Nigeria project

Nigeria project

40 devices · 10MW · Natural gas

Shipping and Configuration

Liquid-cooling equipment is generally transported by sea freight. Contact MiningUS with the destination and site requirements to confirm configuration and shipping charges.

Want to Explore Similar Mining Options?

Explore All Asics >>

Models Coins Meilleur Price Hashrate Power Electricity Algorithm ROI Profit
Antminer S21 XP Hydro BCH, BSV, BTC $6,140.00 473Th/s 5670W 11.99J/TH SHA-256 18 Mon $ 11.32 /day
Antminer S21+ Hydro BCH, BSV, BTC $2,195.00 – $2,645.00 358Th/s 5370W 15.00J/TH SHA-256 10 Mon $ 7.27 /day
Antminer S19 XP Hyd. BCH, BSV, BTC $1,284.00 257Th/s 5304W 20.64J/TH SHA-256 12 Mon $ 3.48 /day
 Antminer S19e XP Hyd BCH, BSV, BTC $750.00 251Th/s 5522W 22.00J/TH  SHA-256 8 Mon $ 2.99 /day

Supplier-listed mining estimates at the time of update; profitability and prices change.

Additional information
SpecificationAP-50Hyd — 96 slots, 500kW continuous generation
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “96-Slot Natural Gas Generator Hydro Cooling Container for Antminer Hydro”

Your email address will not be published. Required fields are marked *

Shipping and Delivery

Delivery costs shown before payment

Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.

Miners and spare parts

Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.

Cooling systems and heavy equipment

Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.

Customs and delivery support

Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.

Read the full shipping policy  |  Contact Mining US

Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.