564kW 80-Slot Immersion Cooling Container For Asic Miners
$88,800.00 – $137,620.00Price range: $88,800.00 through $137,620.00
✓ 1 Year Warranty
BC20 Elite immersion container with four B100 tanks: up to 80 S21, 72 T21/M66S or 64 S21 Imm/S21 XP miners. Maximum electrical load is 564kW; the source dry-cooler specification lists 500kW cooling capacity. Basic/Pro, CE/UL and dry-cooler/water-tower options available.
Immersion Cooling for Crypto Mining
BC20 Elite — Designed for Large-Scale Mining
The BC Series integrates immersion tanks, power distribution cabinets, smart PDUs, network interfaces, circulation pipes, external coolers, controllers and monitoring equipment into a containerized system for scalable deployment.
Flexible Options for Different Scales
Mobile, integrated and expandable configurations support different site requirements. The broader BC Series covers 168kW to 2.02MW; the BC20 Elite specification below lists 500kW cooling and 564kW maximum electrical load.

Low Maintenance Requirements
The single-loop design allows tanks to be shut down separately, reducing downtime during maintenance. Piping is arranged for service access.

Intelligent Management
Integrated cooling control, power monitoring and security monitoring support day-to-day operation.

Product Specification
| Model | BC20 Elite |
|---|---|
| Dimensions, as labeled by supplier | 2896(L) × 2438(W) × 6096(H) mm |
| Miner capacity | 80 × S21; 72 × T21/M66S; 64 × S21 Imm/S21 XP |
| Tanks | 4 × B100 |
| Circulation mode | Single loop / dual loop |
| Coolant volume | 3000 L |
| Ambient temperature | −25°C to 55°C |
| Input voltage | Three-phase 350–480V, 50/60Hz |
| Maximum electrical power load | 564 kW |
| Output voltage | Single-phase 200–277V or three-phase 350–480V, 50/60Hz |
| Safety certification (supplier stated) | CE / UL, according to configuration |
| Non-mining power load | 24–37 kW |
| Power distribution cabinet | 1 × 800A |
| PDU | 4 |
| Smart meter | Included |
| Cooling capacity | 500 kW |
| Cooling type in specification table | Dry cooler; water-tower options also available |
| Inlet / outlet temperature | 48°C / 56°C |
| Design reference temperature | 40°C |
| Monitoring | Operating and environmental parameters: liquid, temperature, voltage, power and others |
| Management | Tank-level mini-LED; web portal; standard SNMP; email integration |
| Container certification (supplier stated) | China Classification Society |
| Warranty | 1 year |
Configuration notes: The source labels the 6096mm dimension as height; confirm the final dimension orientation before site planning. Its general specification table describes a dry-cooler configuration, while the purchase options also include water cooling towers. Confirm cooling performance and electrical requirements for the selected Basic or Pro configuration.
Available Configurations
Choose Basic or Pro, dry cooler or water cooling tower, and CE or UL standard using the Specification selector above.
Shipping and Deployment
Liquid cooling containers generally ship by sea. Destination ports and receiving locations affect freight charges. Contact MiningUS to confirm your configuration, address and shipping costs before ordering.
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Antminer S21 XP IMM | BCH, BSV, BTC | $4,020.00 – $4,020.00 | 300Th/s | 4050W | 13.50J/TH | SHA-256 | 21 Mon | $ 6.48 /day |
| Antminer S21 XP | BCH, BSV, BTC | $3,480.00 | 270Th/s | 3650W | 13.52J/TH | SHA-256 | 20 Mon | $ 5.83 /day |
| Antminer S21 Imm. | BCH, BSV, BTC | $1,625.00 – $1,625.00 | 215Th/s | 3440W | 16.00J/TH | SHA-256 | 14 Mon | $ 4.00 /day |
| Whatsminer M60S | BCH, BSV, BTC | $1,468.00 – $1,468.00 | 186Th/s | 3441W | 18.50J/TH | SHA-256 | 17 Mon | $ 2.90 /day |
| Antminer L9 | DOGE, LTC, BEL | $2,575.00 – $2,900.00 | 16Gh/s | 3360W | 210.00J/GH | Scrypt | 85 Mon | $ 1.01 /day |
Supplier-listed mining estimates at the time of update; profitability and prices change.
| Specification | BC20 Basic-Dry Cooler CE Standard, BC20 Basic-Dry Cooler UL Standard, BC20 Basic-Water Cooling Tower CE Standard, BC20 Basic-Water Cooling Tower UL Standard, BC20 Pro-Dry Cooler CE Standard, BC20 Pro-Dry Cooler UL Standard, BC20 Pro-Water Cooling Tower CE Standard, BC20 Pro-Water Cooling Tower UL Standard |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.