2000W Power Supply for
$45.00
✓ Manufacturer Warranty
HQ2000-A01 2000W power supply for compatible Goldshell Box miners. 176–300V AC input, 12.5V DC output and up to 160A.
Complete your order and payment first. Immediately after payment, visit our Order Customization page and submit the form with your customization requirements.
2000W Power Supply for Goldshell Box Series
The HQ2000-A01 supplies 12.5 V DC power for compatible Goldshell Box miners. The supplier lists AE BOX, AE BOX PRO, AL BOX, KA Box, KD Box, HS Box, LB Box, SC Box and CK Box compatibility.
Specification
| Model | HQ2000-A01 |
|---|---|
| Power | 2000 W |
| Input | 176–300 V AC, 50–60 Hz, 15 A maximum |
| Output current | 0–160 A |
| Output voltage | 12.5 V DC |
| Rating power (supplier table) | >1000 W |
| Dimensions | 245 × 125 × 85 mm |
| Weight | 2.5 kg |
The supplier lists both 2000 W and “rating power >1000 W”; the original label below states 12.5 V / 160 A (2000 W). Input must match the specified voltage range.


Protective Metal Housing
The supplier describes a corrosion-resistant metal enclosure designed for demanding operating environments. Keep ventilation clear and follow the manufacturer’s electrical instructions.
Power Cord Standard
| US | Type A/B |
|---|---|
| UK | Type G |
| EU | Type C/E/F |
| CN | Type I |
These are regional plug references, not selectable configurations. Confirm the power cord and supply voltage for your installation.
Manufacturer Warranty
Manufacturer warranty is listed by the supplier; a specific duration is not stated for this product. Contact MiningUS for applicable coverage.
| Specification | HQ2000-A01 / 2000W / 12.5V DC |
|---|---|
| Miner Compatibility | Goldshell AE BOX, AE BOX PRO, AL BOX, KA Box, KD Box, HS Box, LB Box, SC Box, CK Box |
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.