120kW 30-Slot Immersion Cooling Tank For Asic Miners
$2,300.00 – $11,600.00Price range: $2,300.00 through $11,600.00
✓ 1 Year Warranty
B24D immersion cooling system with 120 kW cooling capacity at 35°C, supporting up to 24 Antminers or 30 Whatsminers. Choose a tank, cooling component, or tank package with a cooling tower or dry cooler and PDU.
Need Customization?
Complete your order and payment first. Immediately after payment, visit our Order Customization page and submit the form with your customization requirements.
B24D Immersion Cooling System
Product Description
The B24D combines high-density immersion cooling with a compact layout for independent warehouse deployment. Its tank accommodates up to 24 Antminers or 30 Whatsminers and connects to an external dry cooler or water cooling tower.
The integrated system design brings together power distribution, networking, sensors and controls, with single-loop circulation, pumps and piping to simplify installation. Select the package that matches your deployment; individual components and tank bundles are available.
Designed for independent deployment
Pair one B24D with a dry cooler to support up to 24 Antminers or 30 Whatsminers.
The integrated system design includes PDUs, network switches, sensors and controllers in a compact, high-density layout.


Single circulation and easier deployment
A single-loop circulation design integrates smart PDUs, networking, circulation pumps and piping.
Installation of the tubing and wiring completes the system connections for deployment.
Core Advantages
Independent Deployment
A tank and external cooling unit form a standalone installation.
High-Density Capacity
Space-efficient accommodation for up to 24 Antminers or 30 Whatsminers.
Single-Loop Circulation
A straightforward circulation layout simplifies tubing and wiring installation.
Integrated Infrastructure
System design incorporates smart PDUs, networking, sensors and controllers.
120 kW Cooling
Rated cooling performance at 35°C for demanding mining installations.
Flexible Configurations
Choose individual components or a tank package with dry cooling or a cooling tower.
Full Specifications
B24D Tank
| Dimensions | 2486 × 746 × 530 mm |
|---|---|
| Input voltage | Three-phase 350–480 V, 50/60 Hz |
| Output voltage | Single-phase 200–277 V, 50/60 Hz |
| Cooling capacity | 120 kW at 35°C |
| Operating temperature | −10°C to 40°C |
| Net weight | 172 kg |
| Coolant volume | 750 L |
| Inlet / outlet temperature | 45 / 65°C |
| Maximum power load | 120 kW |
| Miner capacity | Up to 24 Antminers or 30 Whatsminers |
| External cooling | Dry cooler or water cooling tower |
Dry Cooler (EC Fan)
| Dimensions | 2186 × 1874 × 2100 (source does not specify unit) |
|---|---|
| Gross weight | 769 kg |
| Input voltage | Three-phase 350–480 V, 50/60 Hz |
| Cooling capacity | 120 kW at 35°C |
| Maximum power load | 4 kW |
| Air volume | 38,299 m³/h |
| Noise | 65 dB(A) at 25°C, measured at 16 m |
Shipping & Deployment
Liquid-cooling equipment is generally shipped by sea. Freight charges vary by destination port and receiving location. Confirm the delivery address and shipping cost with MiningUS before ordering.
Package contents follow your selected Specification. Check power supply, site layout and installation requirements before deployment.
Frequently Asked Questions
How many miners can the B24D support?
Up to 24 Antminers or 30 Whatsminers. Confirm the dimensions and immersion suitability of your specific miner before ordering.
What is included in my order?
The contents depend on the selected Specification. Options include individual cooling components, B24 Tank, B24 Tank+Cooling Tower+PDU, and B24 Tank+Dry cooler+PDU. Confirm any additional coolant, cabling, or installation requirements with our team.
Which cooling system can I use?
The B24D supports an external dry cooler or water cooling tower. The listed EC-fan dry cooler is rated at 120 kW at 35°C.
What warranty is listed for this product?
This product is listed with a 1 Year Warranty. Contact MiningUS for service and the applicable warranty terms.
How is this equipment shipped?
Liquid-cooling equipment typically travels by sea. Shipping charges depend on the destination port and receiving location; contact our team to confirm the delivery address and freight cost before ordering.
How do I request customization?
Complete your order and payment first, then submit your requirements through our Order Customization page.
Want to Explore Similar Mining Options?
Explore All ASICs ››| Models | Coins | Reference Price | Hashrate | Power | Efficiency | Algorithm | Est. Payback | Est. Profit |
|---|---|---|---|---|---|---|---|---|
| Antminer S21 XP IMM | BCH · BSV · BTC | $4,020.00 | 300 TH/s | 4,050 W | 13.50 J/TH | SHA-256 | 20 months | $6.55 /day |
| Antminer S21 XP | BCH · BSV · BTC | $3,480.00 | 270 TH/s | 3,650 W | 13.52 J/TH | SHA-256 | 20 months | $5.89 /day |
| Antminer S21 Pro+ | BCH · BTC | $1,760.00–$2,045.00 | 234 TH/s | 3,510 W | 15.00 J/TH | SHA-256 | 13 months | $4.69 /day |
| Antminer S21 Imm. | BCH · BSV · BTC | $1,625.00 | 215 TH/s | 3,440 W | 16.00 J/TH | SHA-256 | 13 months | $4.05 /day |
| Antminer T21 | BCH · BSV · BTC | $2,350.00 | 190 TH/s | 3,610 W | 19.00 J/TH | SHA-256 | 27 months | $2.90 /day |
Swipe horizontally to view all specifications →
Illustrative comparison figures; prices, daily profit and payback are reference estimates, not live quotes or guaranteed returns. Results vary with electricity rates, network conditions and coin prices. Check the shop for current pricing.
Need help choosing your setup?
Contact MiningUS for configuration and freight support.
Staff Authentication · Telegram · WhatsApp
CEO: KEN KILSON · +1 (224) 412-6087
| Specification | 120kW Heat Exchange, B24 Cooling Tower (120kW@35°C), B24 Dry Cooler (120kW@35), B24 Tank, B24 Tank+Cooling Tower+PDU, B24 Tank+Dry cooler+PDU |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.