iBeLink BM-S1 6.8Th/s 2350W Siacoin Miner SC Mining Rig

$768.00

Manufacturer warranty   ✓ PSU Included

iBeLink BM-S1 is a Blake2b-Sia ASIC miner rated at 6.8 TH/s with 2350 W power consumption. It includes a power supply, four cooling fans and an Ethernet interface.

Category: Tags: ,
Description

iBeLink BM-S1 6.8Th/s 2350W Siacoin Miner SC Mining Rig

iBeLink BM-S1 is a Blake2b-Sia ASIC miner rated at 6.8 TH/s with 2350 W power consumption. It includes a power supply, four cooling fans and an Ethernet interface.

Specifications

Manufacturer iBeLink
Model iBeLink BM-S1
Algorithm Blake2b-Sia
Mineable coins Siacoin (SC), SCP
Hashrate 6.8 TH/s
Power consumption 2350 W
Interface Ethernet
Power supply Included
Warranty Manufacturer warranty
Release March 2022
Dimensions 128 × 201 × 402 mm
Weight 9 kg
Noise 75 dB
Fans 4
Operating temperature 5–40°C
Humidity 5–95%

Want to Explore Similar Mining Options?

Explore All Asics >>

Models Coins Meilleur Price Hashrate Power Electricity Algorithm ROI Profit
Antminer Z15 Pro ZEC $7,200.00 – $7,200.00 840ksol/s 2560W 3.05J/KH Equihash 7 Mon $ 40.71 /day
Antminer X9 XMR $5,500.00 1MH/s 2472W 2,472.00J/MH RandomX 5 Mon $ 33.41 /day
Antminer S23 Hyd 3U BCH, BSV, BTC $28,599.00 1160Th/s 11020W 9.50J/TH SHA-256 31 Mon $ 31.00 /day
Antminer Z15K ZEC $4,300.00 – $4,300.00 525kh/s 2483W 4.73J/KH Equihash 6 Mon $ 24.38 /day
SEALMINER A4 Ultra Hydro BCH, BSV, BTC $9,729.00 886Th/s 8372W 9.45J/TH SHA-256 14 Mon $ 23.73 /day

Supplier-listed estimates at the time of update; prices and profitability change.

Additional information
Hashrate6.8 TH/s
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “iBeLink BM-S1 6.8Th/s 2350W Siacoin Miner SC Mining Rig”

Your email address will not be published. Required fields are marked *

Shipping and Delivery

Delivery costs shown before payment

Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.

Miners and spare parts

Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.

Cooling systems and heavy equipment

Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.

Customs and delivery support

Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.

Read the full shipping policy  |  Contact Mining US

Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.