24-Slot 132kW Antminer Liquid Cooling Cabinet
$0.10 – $2,059.00Price range: $0.10 through $2,059.00
AP-EA24 132kW split-type liquid cooling cabinet for up to 24 Antminer hydro miners. Cabinet Only is $2,059; customized CDU and cooling equipment require a separate quotation.
The $0.10 custom-solution listing is an inquiry placeholder, not the price of a complete cooling system. Contact MiningUS before payment for that option.
Visit our Order Customization page to provide site requirements. For a cabinet purchase, complete your order and payment first, then submit your customization details.
Agile modular deployments for precision-matched 24 hydro-miner setups
CONTAINER CAPACITY
ASIC MINERS
24 UNITS
TOTAL POWER
132 kW
FORM FACTOR
Custom
COOLING
Hydro
Supplier availability: Typical lead time 15 days • DDP Sea Shipping Available
⚙ Compatible Models
Supplier estimates captured September 13, 2026; profitability varies. Confirm each miner configuration against the 132kW system load.
Product Description
The AP-EA24 split-type hydro cabinet supports up to 24 Antminer hydro units with 132kW capacity. Separate cooling equipment and a customized CDU allow incremental expansion as facility power becomes available.
Six shelves with four miners each provide an organized installation. External cooling equipment and pipework must be sized for the selected site and hardware.
Core Advantages
Balanced Vertical Rack Layout
Six shelves support four miners each for a 24-unit total.
Precision-Fitted Internal Manifold
304 stainless steel piping distributes coolant across the 24 slots.
Secure Vibration-Proof Connectors
Snap-lock aviation connectors and heavy-duty cabling support stable power connections.
Integrated Network & Routing Base
A network switch and routing channels keep data connections organized.
Individual Breaker Power Protection
Individual circuit protection supports maintenance of separate mining units.
Agile 1-to-N Infrastructure Scaling
A customized central CDU can serve multiple racks when sized for the complete load.
Modular 1-to-N Infrastructure Scalability
The supplier describes customized multi-rack installations from 200kW to 1,000kW, using a high-flow pump system and dedicated power controls. These are complete system capacities; a single AP-EA24 cabinet is rated at 132kW.

Full Specifications
| Model | AP-EA24 |
|---|---|
| Installed capacity | 24 seats |
| Installed power load | 132 kW |
| External dimensions | 1000 × 1000 × 2000 mm |
| Internal dimensions | 950 × 950 × 1950 mm |
| Weight | 170 kg |
| Vertical multistage pump | 4 kW |
| Fluid replenishing pump | 0.2 kW |
| Dry cooling tower fans | 8.3 kW |
| Closed cooling tower fan | 1.1 kW |
| Closed cooling tower spray pump | 0.75 kW |
| System pipeline pressure | 0.2–0.4 MPa |
| System operating temperature | 22–42°C |
| Coolant flow per machine | ≥0.5 m³/h |
| Total circulating coolant volume | ≥0.24 m³ |
| Residual current circuit breaker | 400 A |
| Contactor | 9 A |
| Intermediate relay | 24 V |
| CUL-certified frequency converter (supplier specification) | 380 V |
Cooling-system components depend on the customized configuration and are not all included with Cabinet Only.

Certification Standards
The supplier states that its products meet leading international standards for safety, reliability, and performance.
China Classification Society
Marine & offshore compliance
UL Listed
Safety tested & certified
CSA Certified
North American compliance
CE Marking
European conformity
Complete Cooling Solutions
| Model | Cooling Capacity | Miner Slots | Dimensions (L × W × H) | Application |
|---|---|---|---|---|
| 20-Slot Antminer Hydro Cooling Rack | 110 kW | 20 Slots | 1000 × 1000 × 1800 mm | Modular Small-Scale Setups |
| 24-Slot Antminer Hydro Cooling Rack | 132 kW | 24 Slots | 1000 × 1000 × 2000 mm | Flexible Facility Expansion |
| 28-Slot Antminer Hydro Cooling Rack | 154 kW | 28 Slots | 1000 × 1000 × 2200 mm | Scalable 1-to-N Operations |
| 36-Slot Antminer Hydro Cooling Rack | 198 kW | 36 Slots | 1500 × 1000 × 2000 mm | High-Density Industrial Scaling |
Real Results from Real Miners
Supplier-reported deployment examples and results; photos adapted where needed for MiningUS branding.
Oregon, United States
6 × 132kW Modular Site
A facility expansion matching 132kW racks to available onsite power.
+28% Efficiency Gain · -25% Infrastructure Cost · 99.9% Operational Uptime
Tbilisi, Georgia
1-to-5 Regional Expansion
A regional installation using a customized high-flow CDU station.
+22% Operational Profit · -30% Setup Time · 99.9% Thermal Stability
The supplier’s Oregon example describes six racks within an 800kW power block; six × 132kW equals 792kW of rated cabinet load, before auxiliary-system requirements.
Supplier-reported global deployment: 1.2+ GW cumulative delivered cooling capacity across 50+ countries and regions.
24-Slot Antminer Hydro Cooling Rack FAQs
Why choose a 24-slot cabinet over larger containers?
It allows expansion in smaller 132kW increments to match available facility power.
How does the split configuration optimize site layout?
Centralized CDU and power controls keep the mining rows organized and reduce infrastructure near individual racks.
What are the benefits of matching capacity to the site?
A 24-slot rack supports incremental growth within the available power allocation; allow for auxiliary equipment when planning total load.
Should I use a dry cooler or cooling tower?
The supplier recommends dry cooling for low-maintenance operation and closed cooling towers for stronger performance where ambient temperatures regularly exceed 38°C. Confirm the complete design for your climate.
How is electrical safety managed?
Separate circuit protection isolates groups of miners so a fault or maintenance operation need not stop the entire cluster.
| Specification | Cabinet Only, Contact Us for Customized CDU & Cooling Tower Solutions |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.