15-Slot 200kW Antminer 3U Hydro Cooling Rack

$3,999.00

AP-A3U15 hydro cooling rack for up to 15 compatible Antminer 3U miners and 200 kW total miner load. A modular system with customized CDU integration and a separate heat rejection system for phased expansion.

Need Customization?

Complete your order and payment first. Immediately after payment, visit our Order Customization page and submit the form with your customization requirements.

Description

Scalable modular deployments for up to 15 Antminer 3U hydro units

Container capacity
ASIC miners
15 UNITS
Housed at full load
Total power
200 kW
Continuous miner load
Form factor
Custom
Rack configuration
Cooling
Hydro
Thermal management
Power input380V–415V AC 50/60Hz
AvailabilityConfirm stock and DDP sea delivery with MiningUS

⚙ Compatible Models

View More ›

Supplier reference estimates, not live or guaranteed earnings. Actual results vary with miner settings, network conditions, coin prices and electricity costs.

Product Description

The AP-A3U15 rack supports up to 15 compatible Antminer 3U hydro miners and a combined miner load of 200 kW. A customized CDU and separate heat rejection system can be matched to the site’s layout, cooling demand and expansion plans.

Modular deployment

A rack-based layout allows phased growth, with additional racks and cooling equipment added as the facility expands. The 1-to-N architecture can be configured from 200 kW to 1,000 kW, subject to the required CDU, pumps, electrical supply and heat rejection equipment.

Modular hydro cooling rack deployment

The image illustrates a multi-rack installation; the equipment supplied depends on the agreed configuration.

Core advantages

15 dedicated positions

Mounting and internal organization designed around Antminer 3U miners.

Customized CDU

Liquid circulation can be specified for the miner quantity, load and site conditions.

200 kW capacity

Supports high-density deployment within the system’s rated load.

Pump circulation

A pump system maintains coolant circulation through the cooling loop.

Separate heat rejection

Equipment placement can be planned around the facility layout.

Phased expansion

Add racks and appropriately sized cooling capacity as the operation grows.

Cooling configurations

Dry cooler and closed cooling tower configuration diagrams

Dry cooler and closed cooling tower solutions are available as project configurations. Final equipment selection depends on climate, water availability, miner load and the required coolant temperatures.

Full specifications

ModelAP-A3U15
Miner positions15 Antminer 3U seats
Installed miner power load200 kW
External dimensions (L × W × H)800 × 1050 × 2100 mm
Internal dimensions (L × W × H)750 × 1000 × 2050 mm
Listed rack weight250 kg
Power input380–415 V AC, 50/60 Hz
Vertical multistage pump power3.5 kW
Fluid replenishing pump power0.2 kW
Dry cooling tower fan power12.45 kW
Closed cooling tower fan power2.2 kW
Closed cooling tower spray pump power0.75 kW
System pipeline pressure0.2–0.4 MPa
System operating temperature22–42°C
Coolant circulation demand per miner≥0.5 m³/h
Listed system coolant volume requirement≥0.28 m³
Residual current circuit breaker400 A
Contactor9 A
Intermediate relay24 V
Frequency converter380 V

Cooling tower power figures refer to the respective configurations. Auxiliary cooling equipment requires power in addition to the miner load.

Project configuration and delivery

Contact MiningUS with the delivery location, miner models, available power and deployment timeline for a tailored configuration and shipping quote.

Telegram · WhatsApp · Verify official contacts

Frequently asked questions

Can I run 15 miners at full load?

The rack has 15 positions. The combined miner power must stay within 200 kW, with cooling equipment sized for the site conditions.

Can I expand later?

Yes. Modular deployment allows additional racks and appropriately sized CDU, pump and heat rejection capacity. Expansion also requires suitable electrical infrastructure.

Which cooling configuration should I choose?

Dry cooler and closed cooling tower configurations should be evaluated against local climate, water availability and operating temperatures.

Is 200 kW cooling guaranteed in every climate?

Cooling performance depends on ambient conditions and the selected heat rejection equipment. Confirm the design conditions for the project.

Can mining heat be reused?

Heat can be recovered through a suitably engineered heating loop. The required design depends on the available heat load and the heating application.

What warranty applies?

Warranty terms should be confirmed in the project quotation. A fixed warranty duration is not specified on this product’s source listing.

Want to Explore Similar Mining Options?

Explore All ASICs ››
ModelsCoinsReference PriceHashratePowerEfficiencyAlgorithmEst. PaybackEst. Profit
Antminer S21 XP HydroBCH · BSV · BTC$6,140.00473 TH/s5,670 W11.99 J/THSHA-25618 months$11.23 /day
Antminer S21+ HydroBCH · BSV · BTC$2,195.00–$2,645.00358 TH/s5,370 W15.00 J/THSHA-25610 months$7.21 /day
Whatsminer M63SBCH · BSV · BTC$2,720.00390 TH/s7,215 W18.50 J/THSHA-25615 months$6.21 /day
Antminer S19 XP+ HydBCH · BSV · BTC$1,150.00293 TH/s5,567 W19.00 J/THSHA-2569 months$4.49 /day
Antminer S19e XP HydBCH · BSV · BTC$750.00251 TH/s5,522 W22.00 J/THSHA-2568 months$2.95 /day

Swipe horizontally to view all specifications →

Illustrative comparison figures; prices, daily profit and payback are reference estimates, not live quotes or guaranteed returns. Results vary with electricity rates, network conditions and coin prices. Check the shop for current pricing.

Additional information
Rack capacity15 Antminer 3U miners, 200 kW
Reviews (0)

Reviews

There are no reviews yet.

Be the first to review “15-Slot 200kW Antminer 3U Hydro Cooling Rack”

Your email address will not be published. Required fields are marked *

Shipping and Delivery

Delivery costs shown before payment

Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.

Miners and spare parts

Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.

Cooling systems and heavy equipment

Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.

Customs and delivery support

Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.

Read the full shipping policy  |  Contact Mining US

Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.