BITMAIN ANTSPACE HW5 210-Slot 1.2MW 40HQ Hydro Mining Container
$84,000.00
40ft HQ hydro-mining container with up to 210 Antminer slots and 1.2 MW cooling capacity. Its dry-wet hybrid tower combines dry cooling with evaporative assistance for changing seasonal conditions.
1.2MW ANTSPACE HW5 210-Slot Hydro Container
210 units
1,200 kW
40ft HQ
Hydro
Power input: 400 V ±5%, 50/60 Hz. Confirm the current delivery schedule for your destination.
Compatible Models
| Model | Hashrate / Efficiency | Slots | Full-load estimate |
|---|---|---|---|
| Antminer S19 XP+ Hyd | 293Th/s · 19 J/Th | 210 | $2,345.70/day |
| Antminer S21 XP Hydro | 473Th/s · 12 J/Th | 210 | $3,786.30/day |
| Antminer S21+ Hydro | 358Th/s · 15 J/Th | 210 | $2,866.50/day |
| Antminer S21e Hydro | 310Th/s · 17 J/Th | 210 | $2,482.20/day |
| Antminer S23 Hyd | 580Th/s · 9.5 J/Th | 210 | $4,643.10/day |
Supplier-listed compatibility and revenue estimates. Actual output varies; selected miner loads must remain within system ratings.
Product Description
The ANTSPACE HW5 integrates hydro-miner racks, a CDU, power cabinets and a dry-wet hybrid cooling tower in a 40ft HQ container. Dry operation reduces water use in cooler weather; evaporative assistance supports heat rejection during hot conditions.
PLC and HMI controls monitor coolant temperature, flow and pressure. The supplier lists a PUE of 1.017 at 25°C ambient and reports reductions of 40% in site footprint and 75% in installation labor compared with its reference setup. These figures depend on the project and operating conditions.
Full Specifications
| Model | ANTSPACE HW5 |
|---|---|
| Capacity | 210 miner slots |
| External dimensions (L × W × H) | 12,192 × 2,438 × 2,896 mm |
| Internal dimensions | 12,000 × 2,230 × 2,660 mm |
| Listed weight | 14,000 kg |
| Main switch capacity | 1,200 × 2 A |
| Rated / maximum supported input power | 1,200 kW |
| Maximum supported input current | ≤986 × 2 A |
| Maximum current per miner slot | ≤10 A |
| Flow rate | ≥85 m³/h |
| Units per 2,500 kVA transformer | 2 (supplier recommendation) |
| Heat dissipation capacity | 1,200 kW |
| Outlet temperature at 28°C wet bulb | 35°C |
| Operating power | 15–29 kW range (supplier lists ≤15–29 kW) |
| Water supply / drain interfaces | DN40 / DN65 |
| Noise at 25°C, 15 m | 70 dBA |
| Water consumption | 0.7–1.3 m³/h |
| Internal coolant volume | 1.6 m³ |
| Input voltage / frequency | 400 V ±5%, 50/60 Hz |
| PUE at 25°C ambient | 1.017 |
| Supplier-listed safety standards | NFPA 79:2021; UL 508A:2018 R8.21; CSA C22.2 No.14-18; ANSI/ISO 12100:2012; IEC 60204 Ed.5.1 2009 |
Certification Standards
The supplier states that its products meet leading international standards for safety, reliability, and performance.
China Classification Society
Marine & offshore compliance
UL Listed
Safety tested & certified
CSA Certified
North American compliance
CE Marking
European conformity
Certification statements are supplier claims. Applicable certificates and configuration scope should be confirmed for the project.
Complete Cooling Solutions
| Container | Cooling capacity | Miner slots | Dimensions (L × W × H) | Application |
|---|---|---|---|---|
| HW5 210-Slot Antminer Hydro Cooling Container | 1.2 MW | 210 | 12,192 × 2,438 × 2,896 mm | Commercial-scale mining |
| 308-Slot Antminer Hydro Cooling Container | 1.5 MW | 308 | 12,192 × 2,438 × 2,896 mm | Mid-to-large operations |
| 420-Slot Antminer Hydro Cooling Container | 2.4 MW | 420 | 12,192 × 2,438 × 2,896 mm | Industrial-scale projects |
| 480-Slot Antminer Hydro Cooling Container | 2.6 MW | 480 | 12,192 × 2,438 × 2,896 mm | Mega-scale mining facilities |
Real Results from Real Miners
These photographs, project descriptions and figures are supplied by the distributor and are not independently verified MiningUS results.
Calgary, Canada — 10 × 1.2MW Hydro Project

The supplier describes cold-weather dry-mode operation and reports +100% freezing protection, −35% winter water use and $850,000 annual savings.
Vientiane, Laos — 5 × 1.2MW Hydro Project

The supplier reports 1.017 running PUE, −75% on-site installation labor and 99.9% thermal uptime in humid tropical conditions. Actual project outcomes depend on climate, loading, water supply and maintenance.
| Capacity | 210 slots / 1.2 MW |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.