Antminer Hydro Power Cable 1.5M 20A 500V for Hydro Cooling Miners
$12.00
✓ Manufacturer Warranty
1.5m four-core 2.5mm² power cable rated 20A, 500V for compatible Antminer hydro-cooling miners. Custom lengths and bulk orders available.
Product Description
This 1.5m power cable connects compatible Antminer hydro-cooling miners. It uses four-core 2.5mm² wire and is rated at 20A, 500V. Custom lengths and bulk orders are available on request.
Specifications
| Product | Power Cable for Antminer Hydro-cooling Miner |
|---|---|
| Length | 1.5m; custom lengths available |
| Rated current | 20A |
| Rated voltage | 500V |
| Conductor size | 2.5mm² |
| Construction | Four-core cable |
| Bulk orders | Accepted |
Compatible Miners
The supplier lists Antminer T19 Hydro, S19 Hyd, S19 XP Hyd, S19 Pro Hydro, S19 Pro+ Hyd and S21 Hydro. Confirm the connector and electrical requirements for your exact miner.
Customization
For a custom cable length or a bulk order, contact MiningUS with your requirements.
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Antminer S21 XP Hydro | BCH, BSV, BTC | $6,140.00 | 473Th/s | 5670W | 11.99J/TH | SHA-256 | 18 Mon | $ 11.23 /day |
| Antminer S21+ Hydro | BCH, BSV, BTC | $2,195.00 – $2,645.00 | 358Th/s | 5370W | 15.00J/TH | SHA-256 | 10 Mon | $ 7.21 /day |
| Antminer S21 Hyd | BCH, BSV, BTC | $2,463.00 | 335Th/s | 5360W | 16.00J/TH | SHA-256 | 13 Mon | $ 6.34 /day |
| Antminer S19 XP Hyd. | BCH, BSV, BTC | $1,284.00 | 257Th/s | 5304W | 20.64J/TH | SHA-256 | 12 Mon | $ 3.43 /day |
| Antminer S19e XP Hyd | BCH, BSV, BTC | $750.00 | 251Th/s | 5522W | 22.00J/TH | SHA-256 | 9 Mon | $ 2.94 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Specification | 1.5m / 20A / 500V / 4-core 2.5mm² |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.