iBelink BM-KS MAX 10.5Th/s 3400W KAS Miner Asic Machine Kaspa Mining
$16,900.00
Manufacturer warranty ✓ PSU Included
iBeLink BM-KS MAX is an ASIC miner for kHeavyHash mining, rated at 10.5 TH/s with 3400 W power consumption. It uses Ethernet networking and includes the power supply.
iBelink BM-KS MAX 10.5Th/s 3400W KAS Miner Asic Machine Kaspa Mining
iBeLink BM-KS MAX is an ASIC miner for kHeavyHash mining, rated at 10.5 TH/s with 3400 W power consumption. It uses Ethernet networking and includes the power supply.
Specifications
| Manufacturer | iBeLink |
|---|---|
| Model | iBeLink BM-KS MAX |
| Algorithm | kHeavyHash |
| Mineable coins | Kaspa (KAS), SDR |
| Hashrate | 10.5 TH/s |
| Power consumption | 3400 W |
| Interface | Ethernet |
| Power supply | Included |
| Warranty | Manufacturer warranty |
| Release | February 2024 |
| Dimensions (supplier listed) | 424 × 289 × 388 mm |
| Weight | 12.2 kg |
| Noise | 75 dB |
| Fans | 4 |
| Operating temperature | 5–45°C |
| Humidity | 5–95% |
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| DragonBall Miner KS6 Pro+ | KAS, SDR | $4,999.00 | 11Th/s | 3600W | 327.27J/TH | kHeavyHash | Never | $ -2.20 /day |
| DragonBall Miner KS6 Pro | KAS, SDR | $4,570.00 | 10.5Th/s | 3600W | 342.86J/TH | kHeavyHash | Never | $ -2.29 /day |
| Dragonball KS6 | KAS, SDR | $4,480.00 | 10.5Th/s | 3400W | 323.81J/TH | kHeavyHash | Never | $ -2.05 /day |
| Dragonball KS6 S | KAS, SDR | $4,470.00 | 10Th/s | 3600W | 360.00J/TH | kHeavyHash | Never | $ -2.39 /day |
| SuperScalar K10 | ALPH, KAS, RXD | $3,200.00 | X Gh/s | 1750W | -J/GH | FPGA | Never | $ -2.10 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Hashrate | 10.5 TH/s |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.