1.2MW 210-Slot Integrated Antminer Hydro Mining Container (40HQ)
$64,000.00
This hydro mining container is an all-in-one solution with an integrated closed cooling tower, supporting up to 210 Antminer S19/S21/S23 series hydro miners for stable Bitcoin mining.
Need Customization?
Complete your order and payment first. Immediately after payment, visit our Order Customization page and submit the form with your customization requirements.
210-Slot One-Stop Fully Integrated "Plug-and-Play" Container Solution
⚙ Compatible Models
Product Description
The 1.2MW 210-Slot Integrated Antminer Hydro Mining Container 40FT HQ features a built-in, high-efficiency closed-loop cooling tower, integrating power distribution and water cooling circulation control within a single, unified frame for turnkey Bitcoin mining deployment.
This all-in-one liquid cooling system offers a streamlined plug-and-play experience, requiring only level placement, main power hookup, and a quick water top-off to begin operating a high-density crypto mining farm.
Its factory-calibrated and sealed cooling loop is designed to ensure maximum water-loop integrity and consistent thermal performance under load, making it a highly reliable, low-maintenance, and rapid-deployment mining infrastructure solution for megawatt-scale BTC mining sites.
01. Integrated All-in-One System
Integrates the rack, CDU, power cabinet, control unit, and closed-loop cooling tower into a single container for rapid on-site setup, minimizing deployment time and civil engineering costs.
02. In-House Precision & Fittings
Features precision-engineered piping, reinforced fittings, and carefully configured internal coolant routes to ensure maximum pressure resistance and long-term system reliability.
03. Advanced CDU & Leak Detection
The integrated CDU combines intelligent pumping, precise heat exchange, expansion tanks, and built-in leak detection sensors, delivering high-performance circulation with instant safety monitoring.
04. Individual Power Switches
Every miner slot is equipped with an independent power switch and breaker, allowing safe single-unit maintenance or shutdown without disrupting overall container operation.
05. Intelligent Management System
Monitors flow rate, pressure, temperature, PLC status, cooling conditions, and system alarms in real time, enabling automated operation and remote mobile or PC control.
06. Built-in Closed-Loop Tower
The built-in closed-loop cooling tower supports efficient heat rejection and flexible operating modes, providing reliable cooling performance while reducing external infrastructure requirements.
| Model | AP-HC40-A210 | Installed capacity | 210 seat |
| Installed powerload | 1155 KW | Power of the light-duty vertical multistage pump | 30 kW |
| Power of the fluid replenishing pump | 0.2 KW | Total power of the dry cooling tower fan | -- |
| Total power of the closed cooling tower fan | 16.5 KW | Total power of the closed cooling tower spray pump | 4 KW |
| System pipeline pressure | 0.2-0.4 MPA | Operating temperature range of the system | 22-42 ℃ |
| Coolant circulation demand of a single machine | ≥0.5 m³/h | Total demand for circulating coolant within the system | ≥22 m³ |
| Molded Case Circuit Breaker | 125 A | Residual Current Circuit Breaker | 630 A |
| Contactor | 9 A | Intermediate relay | 24 V |
| CUL certified frequency converter | 380 V |
Certification Standards
Our products meet leading international standards for safety, reliability, and performance.
compliance
compliance
Complete Cooling Solutions
We design and manufacture a complete range of hydro cooling solutions for every scale, from hydro cooling cabinets and containers to CDUs and dry coolers.
|
Compare
210-Slot 40FT Antminer Hydro Container
|
210-Slot 20FT Antminer Hydro Container
|
240-Slot Antminer Hydro Container
|
308-Slot Antminer Hydro Container
|
|
|---|---|---|---|---|
| ❄ Cooling Capacity | 1.2 MW | 1.2 MW | 1.4 MW | 1.7 MW |
| ⚙ Miner Slots | 210 Slots | 210 Slots | 240 Slots | 308 Slots |
| 📏 Dimensions (L × W × H) | 12192 × 2438 × 2896 mm | 6058 × 2438 × 2896 mm | 6058 × 2438 × 2896 mm | 12192 × 2438 × 2896 mm |
| ▣ Application | Turnkey Commercial Mining | Flexible Space & Modular Layouts | Mid-to-Large Mining Farms | Industrial-Scale Operations |
| Read More → | Read More → | Read More → |
Real Results from Real Miners
View All ››4 × 1.2MW Hydro Project
Sustaining peak hashrates using built-in closed-loop towers.
10 × 1.2MW Hydro Project
Minimizing external tower installation with integrated closed-loop cooling.
Having the closed-loop cooling tower pre-installed saved us massive civil engineering and pipe-welding costs. We dropped the container, hooked up water and power, and were immediately mining without any plumbing hassles.
— VP of Operations, Texas Mining Facility210-Slot Integrated Antminer Hydro Cooling Container FAQs
The cooling tower, CDU, mining racks, power distribution, and control system are integrated into one container and factory-tested before shipment.
This reduces external piping, on-site welding, cooling-tower installation, and commissioning work, making the mining deployment more standardized, compact, and easier to manage.
Most of the hydraulic piping, cooling equipment, electrical distribution, controls, and internal connections are assembled and tested before the container leaves the factory.
Once delivered, the site mainly needs the prepared electrical supply, water connections where required, network access, and a suitable foundation. This can significantly reduce field installation and commissioning work compared with a split system.
The miner-side coolant remains inside a sealed circulation loop rather than being continuously exposed to outside air, dust, and contaminants.
This helps maintain cleaner coolant, reduces scale and debris inside miner water channels, and can lower maintenance requirements for heat exchangers, manifolds, pumps, and ASIC cooling plates.
The control system monitors key operating conditions such as coolant temperature, flow, pressure, pump status, and leak-detection sensors.
If an abnormal condition is detected, the system can issue alarms and use configured protection logic to isolate affected equipment or shut down miner circuits before overheating or coolant loss causes more serious damage.
During cooler weather, the system can rely more heavily on dry heat rejection, reducing water use and simplifying operation.
During hotter conditions or high thermal loads, the wet cooling stage can provide additional heat-rejection capability. The control system adjusts operation according to ambient temperature and cooling demand.
The miner-side coolant circulates in a closed loop and is not normally consumed during operation.
However, if the cooling tower uses an evaporative or wet cooling mode, some make-up water may be required for the tower itself. Actual water consumption depends on ambient conditions, operating mode, and site configuration.
The site should be checked for sufficient electrical capacity, suitable three-phase voltage, foundation strength, truck and crane access, network connectivity, drainage, ventilation clearance, and adequate service space around the container.
Local ambient temperature, humidity, water availability, water quality, altitude, and seasonal climate should also be reviewed so the cooling configuration can be sized correctly before production.
An integrated container is especially useful when the priority is fast deployment, standardized installation, reduced on-site construction, and a compact all-in-one mining solution.
A split-type system may be more suitable when a site needs highly flexible placement of external dry coolers, specialized central cooling infrastructure, or phased expansion across many containers.
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.