20-Slot 200kW Whatsminer 2U Modular Hydro Cooling Rack
$11,820.00 – $12,800.00Price range: $11,820.00 through $12,800.00
200kW modular hydro cooling rack for 20 compatible WhatsMiner M53, M63 or M73 series miners. Split deployment supports customized CDU sizing and multi-rack expansion. Choose Cabinet+Closed Tower or Cabinet+Dry Cooler.
Complete your order and payment first. Then visit our Order Customization page and submit your requirements.
Flexible 200kW hydro cooling hub for 20 WhatsMiner units
Power Input 380V–415V AC 50/60Hz
Availability Typical lead time 15 days • DDP Sea Shipping Available
Compatible Models
The supplier’s compatibility widget reports zero slots. The product specifications confirm 20 positions; the zero-slot and $0.00/day figures reproduced below are display errors and should not be used for capacity or return estimates. Confirm the exact miner version before ordering.
Product Description
This 20-slot modular hydro cooling rack supports up to 200kW of WhatsMiner hydro miner load. The split arrangement lets the cabinet and outdoor heat-rejection equipment be positioned to suit the site.
Match the customized CDU, pumping capacity and cooling equipment to the miner configuration and deployment space. The modular structure supports staged expansion from one rack to a larger installation.
The supplier describes a split system in the introduction but calls the first feature all-in-one. Confirm the final rack, CDU, power cabinet and control arrangement in the ordered package.
Core Advantages
01. Coordinated Rack Layout
The supplier illustrates a rack with organized power and coolant connections. The final CDU and control-cabinet arrangement depends on the ordered configuration.
02. Isolating Valve System
Red and blue valves identify hot and cold branches. Sealed manifolds and reinforced lines support isolation during maintenance.
03. Individual PDU Breakers
Dedicated miner breakers allow one unit to be electrically isolated for service while the rest of the rack remains in operation.
04. Bottom Water Leak Detection
A sensing rope along the bottom of the cabinet provides a leak alarm for onsite response.
05. Durable Fittings and Structure
304 stainless-steel manifolds, aviation plugs, reinforced tubing and manual ball valves form the distribution system.
06. Customizable and Expandable CDU
Cooling capacity, pump specifications and expansion connections can be selected for the miner count, site conditions and heat-rejection equipment.
Modular 1-to-N Infrastructure Scalability
The supplier describes expansion from 200kW to 1,000kW using multiple racks, a customized high-flow pump system and centralized power control. Plan CDU capacity, main pipework, monitoring and outdoor cooling for the intended expansion.

Full Specifications
| Model | AP-EM20 |
|---|---|
| Installed capacity | 20 miners |
| Installed power load | 200kW |
| External dimensions | 850 × 1000 × 2130mm |
| Internal dimensions | 800 × 950 × 2080mm |
| Weight | 230kg |
| Vertical multistage pump | 4kW |
| Fluid replenishing pump | 0.2kW |
| Dry cooling tower fan total power | 8.3kW |
| Closed cooling tower fan total power | 3kW |
| Closed cooling tower spray pump | 1.1kW |
| System pipeline pressure | 0.2–0.4MPa |
| System operating temperature | 0–50°C |
| Coolant circulation per miner | ≥0.6m³/h |
| System coolant volume | ≥0.25m³ |
| Residual current circuit breaker | 400A |
| Contactor | 9A |
| Intermediate relay | 24V |
| CUL-certified frequency converter | 380V |
Supplier-listed system specifications; confirm which cooling components are included in the quoted package.

Certification Standards
The supplier states that its products meet leading international standards for safety, reliability, and performance.
China Classification Society
Marine & offshore compliance
UL Listed
Safety tested & certified
CSA Certified
North American compliance
CE Marking
European conformity
Complete Cooling Solutions
| Model | Cooling Capacity | Miner Slots | Dimensions (L × W × H) | Application |
|---|---|---|---|---|
| 12-Slot Whatsminer Integrated Hydro Cooling Rack | 120 kW | 12 Slots | 850 × 1,000 × 2,130 mm | Professional Home Setups |
| 20-Slot Whatsminer Modular Hydro Cooling Rack | 200 kW | 20 Slots | 850 × 1,000 × 2,130 mm | Modular Facility Scaling |
| 160-Slot Whatsminer Hydro Cooling Container | 1.6 MW | 160 Slots | 6,058 × 2,438 × 2,896 mm | Industrial Mining Projects |
| 240-Slot Whatsminer Hydro Cooling Container | 2.4 MW | 240 Slots | 13,716 × 2,438 × 2,896 mm | Mega-Scale Global Farms |
Source dimension punctuation has been normalized; confirm the final footprint before installation.
Real Results from Real Miners
Manufacturer-supplied deployment examples and reported results. Photos are adapted for MiningUS branding; the source describes these as 2U hydro installations, including WhatsMiner equipment.
Muscat, Oman
2 × 1-to-1 Standalone Setups
Two independent systems with dedicated dry coolers are described as providing redundancy in a hot environment.
100% System Redundancy · +28% Thermal Stability
The source lists an unclear “120W USD” Independent Cluster figure; supplier clarification is needed.
Southeast Asia
1-to-5 High-Density Expansion
A centralized high-flow CDU and separate power cabinet serve five 20-slot racks, described by the supplier as a 100-unit WhatsMiner 2U cluster.
+30% Space Efficiency · -28% Setup Time · 1.1MW Total Capacity
The reported 1.1MW project figure differs from five racks at 200kW each; confirm the project’s actual system scope.
Supplier-reported deployment totals: 1.2+ GW cooling capacity across 50+ countries and regions.
20-Slot Whatsminer 2U Modular Hydro Cooling Rack FAQs
Can a 200kW cooling rack run 20 WhatsMiner Hydro miners?
Yes, if the exact M53, M63 or M73 series models and operating modes keep the combined miner demand within 200kW. The rack provides 20 individual positions.
Does this cooling rack support overclocked WhatsMiner Hydro miners?
The supplier supports high-power operation within the 200kW total rating. Set miner count and performance mode according to combined demand and the matched cooling system.
Can different WhatsMiner Hydro models be installed in the same rack?
Compatible models can share a rack when dimensions, power requirements, coolant connections and total load are suitable. Confirm the exact combination before installation.
How does the system keep sufficient coolant flow across 20 miners?
Centralized circulation uses pressure regulation and PLC constant-flow control. The supplier lists 13m³/h rated circulation; verify sufficient flow at every branch, since total flow alone does not guarantee equal distribution.
Are the quick connectors included with the cooling rack?
The supplier says the required quick connectors are prepared before shipment for the specified compatible miners, reducing onsite pipe assembly. Confirm the connection specification with the order.
Can individual miners be managed without controlling the entire rack?
Each miner has individual control. Central PLC monitoring tracks power, temperature, coolant flow, pressure and network status; MODBUS-RTU integration is supplier-listed.
What electrical infrastructure is required for a fully loaded 20-miner rack?
The site requires industrial three-phase service sized for miners plus pumps, controls and external cooling equipment. Include cable and protection requirements and any planned high-performance operation in the electrical design.
Can multiple 200kW racks be added as the mining farm expands?
Additional racks can be added as electrical and cooling resources become available. Plan distribution pipes, pumping, heat rejection and centralized monitoring for the total site capacity.
| Specification | Cabinet+Closed Tower, Cabinet+Dry Cooler |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.