12-Slot 120kW Avalon 2U Hydro Cooling Rack
$6,500.00 – $7,500.00Price range: $6,500.00 through $7,500.00
This Avalon 2U hydro cooling cabinet supports 12 Avalon A1566HA units for efficient water-cooled Bitcoin and cryptocurrency mining with a 120kW cooling capacity.
Complete your order and payment first. Immediately after payment, visit our Order Customization page and submit the form with your customization requirements.
For most areas, the liquid cooling equipment will be shipped to you via sea freight. Ports and receiving points in different regions will incur different shipping charges. It is recommended that you contact customer service to confirm address details and calculate shipping costs before placing an order.
Product Description
The Avalon water cooler AP-X12 is a compact water cooling cabinet designed for home and small-scale Bitcoin mining, supporting 12 Avalon A1566HA 2U water-cooled miners.
It integrates rack space, pump station, CDU, and control system into one energy-efficient hydro cooling solution, minimizing footprint while maximizing coolant circulation.
Certified with CSA and CE, this home water cooler enables safe and rapid deployment in indoor mining environments. The hydro cooler supports closed cooling towers and dry cooling towers, providing flexible liquid cooling solutions. As a reliable liquid cooler, it delivers stable performance and represents a best water cooler choice for compact ASIC mining setups.
Super Durable Material & Corrosion Resistance
Thickened 2.0mm steel + full 304 stainless steel components (valves/manifolds/seamless pipes) – corrosion/pressure-resistant, extends service life in harsh conditions.
Efficient Maintenance with Minimal Downtime
Supports individual machine shutdown without overall system halts, significantly reducing maintenance downtime and improving cluster operational efficiency.
Specifications
| Model | AP-X12 |
| Installed Units | 12 × Avalon A1566HA 2U |
| Dimensions (L × W × H) | 850 × 1000 × 2130 mm |
| Weight | 350 kg |
| Installed Load | 120 kW |
| Light Vertical Multistage Pump Power | 2.2 kW |
| Rated Flow Rate | 8 m³/h |
| Make-up Pump Power | 0.6 kW |
| Cooling Medium | Ethylene Glycol |
| Communication Protocol | MODBUS-RTU |
| Operating Pressure | 0.1–0.35 MPa |
| System Operating Basic Parameters | |
| System Pipeline Pressure | 0.2–0.4 MPa |
| System Operating Temperature Range | 0–50 °C |
| Single-Unit Cooling Liquid Circulation Demand | ≥0.6 m³/h |
| System Internal Cooling Liquid Total Demand | ≥0.15 m³ |
| Electrical System Main Parameters | |
| Plastic Circuit Breaker | 63 A |
| Residual Current Circuit Breaker | 65 A |
| Contactor | 9 A |
| Intermediate Relay | 160 V |
| Frequency Converter | 380 V |
| Dry Cooler Specifications | |
| Dimensions | 1550 × 1172 × 1710 mm |
| Weight | 378 kg |
| Cooling Capacity | 122.6 kW |
| Fan Quantity | 1 PCS |
| Working Fluid | Ethylene Glycol |
| Fluid Flow Rate | 8.4 |
| Inlet / Outlet Temperature | 47–60 °C |
| Ambient Temperature | 37 °C |
| Operating / Max Pressure | 0.25 / 0.4 MPa |
| Dry Cooling Tower Fan Total Power | 4.75 kW |
In-stock miners will ship within 3 business days. For bulk orders, please allow an additional 1–2 days via DHL Express, UPS, FedEx, or TNT.
Pre-order miner delivery times depend on the factory schedule. Estimated delivery dates are provided on the order page, but delays may occur due to production issues.
Shipments are processed on a first-paid, first-shipped basis. Once full payment is received, we aim to ship as quickly as possible. Payments via wire transfer (T/T) may take 3–7 business days to verify, while cryptocurrency payments typically take a few hours to 1 business day.
International shipping usually takes 5–8 business days, with remote locations potentially requiring 8–10 days.
*All sales are final and non-refundable. Please understand, this is an industry standard.
Want to Explore Similar Mining Options?
Explore All Asics ››| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Antminer S23e Hyd 2U |
₿
₿
₿
|
$19,030.00 – $19,030.00 | 865Th/s | 8650W | 10.00J/TH | SHA-256 | 38 Mon | $ 16.56 /day |
| SealMiner A3 Pro Hyd |
₿
₿
₿
|
$6,980.00 – $9,930.00 | 660Th/s | 8250W | 12.50J/TH | SHA-256 | 22 Mon | $ 10.66 /day |
| Avalon A1566HA 2U |
₿
₿
₿
|
$3,398.00 – $4,195.00 | 480TH/s | 8064W | 16.80J/TH | SHA-256 | 21 Mon | $ 5.27 /day |
| Antminer L11 Hyd 2U |
Ð
Ł
₿
|
$8,866.00 | 35Gh/s | 5775W | 165.00J/GH | Scrypt | 78 Mon | $ 3.81 /day |
Customer FAQs
Consider your hash rate, miner compatibility, available space, power capacity, cooling requirements, and future scalability when selecting liquid cooling equipment.
Not sure what to choose? Contact us for a custom solution tailored to your mining operation.
Liquid cooling systems are generally much quieter than traditional air-cooled mining systems because miner fan usage is significantly reduced or eliminated.
Depending on the installation, some sound may still come from circulation pumps, dry coolers, cooling tower fans, and other auxiliary equipment under high load.
Yes. The correct coolant should be selected according to the equipment specification to maintain efficient heat transfer, control corrosion, and protect internal water blocks, pumps, manifolds, and piping.
Depending on the system, purified water, deionized water, ethylene glycol mixtures, or another approved cooling medium may be required.
Installation complexity depends on the scale of the project. Compact indoor cabinets and racks can be deployed relatively quickly, while large mining containers require proper electrical, piping, cooling, and site infrastructure.
MiningUS liquid cooling solutions are designed to simplify deployment by integrating major cooling, circulation, control, and power components wherever possible.
Yes. Routine maintenance is recommended to keep the system operating efficiently. This may include inspecting pumps, filters, manifolds, piping, heat exchangers, dry coolers, and coolant quality.
Coolant may also need to be tested, filtered, topped up, or replaced over time depending on operating conditions.
Yes. With properly designed heat-recovery infrastructure, waste heat from hydro-cooled mining equipment can potentially be reused for applications such as space heating, hot water, floor heating, greenhouses, or swimming pools.
The exact heat-recovery design depends on the miner load, coolant temperatures, local climate, and heating application.
Discounts may be available for bulk purchases, large mining projects, repeat customers, and selected promotional offers.
Contact our team with the product, required quantity, delivery country, and project requirements to request current pricing.
Yes, but always verify that you are communicating with an authorized MiningUS representative before sending payment.
-
1. Verify the representative first.
Use the official MiningUS authentication page: https://miningus.io/authentication/ -
2. Confirm the identity of the representative.
CEO: KEN KILSON
Phone: +1 (224) 412-6087 -
3. Verify payment instructions before sending funds.
Only use payment details confirmed through official MiningUS channels and never send funds to an account that has not been independently verified. -
4. Keep your order and payment records.
Retain invoices, payment confirmations, transaction IDs, and correspondence related to your purchase.
Following these verification steps helps ensure that your payment reaches the correct recipient and reduces the risk of impersonation or payment fraud.
| Specification | Cabinet+Closed Tower, Cabinet+Dry Cooler |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.