Elphapex DG2+ 20.5Gh/s 3900W Dogecoin Litcoin Bells Miner
$7,998.00
✓ Manufacturer Warranty · PSU Not Included
Elphapex DG2+ Scrypt miner: 20.5 GH/s at 3,900 W, with air cooling and Ethernet networking for Litecoin and Dogecoin.
Elphapex DG2+ Scrypt Miner
The DG2+ is an air-cooled Scrypt ASIC miner for Litecoin, Dogecoin and compatible mining pools. Its nominal 20.5 GH/s hashrate and 3,900 W power rating correspond to approximately 0.19 J/MH efficiency.
Specifications
| Manufacturer / model | ElphaPex DG2+ |
|---|---|
| Algorithm | Scrypt |
| Hashrate | 20.5 GH/s |
| Power | 3,900 W |
| Nominal efficiency | Approximately 0.19 J/MH |
| Dimensions | 369 × 196 × 287 mm |
| Weight | 16.5 kg |
| Cooling | Air cooling; 4 fans |
| Noise level | 75 dB (supplier listed) |
| AC input voltage | 200–240 V |
| Network | Ethernet |
| Operating temperature | 5–45°C |
| Humidity | 5–95% RH |
| Power supply | Not included (supplier listing) |
Product imagery represents the model. The supplier lists this offering without a PSU; arrange a compatible power supply and suitable ventilation.
Setup Guide
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| VOLCMINER D1 Pro | DOGE, LTC, BEL | $5,774.00 | 20Gh/s | 3700W | 185.00J/GH | Scrypt | 60 Mon | $ 3.19 /day |
| Antminer L11 | DOGE, LTC, BEL | $4,750.00 | 20Gh/s | 3680W | 184.00J/GH | Scrypt | 49 Mon | $ 3.21 /day |
| VolcMiner D3 | DOGE, LTC, BEL | $7,680.00 | 20Gh/s | 3580W | 179.00J/GH | Scrypt | 77 Mon | $ 3.33 /day |
| Bitmain Antminer L9 Hyd 2U | DOGE, LTC, BEL | $5,670.00 – $5,670.00 | 27Gh/s | 5670W | 210.00J/GH | Scrypt | 54 Mon | $ 3.50 /day |
| Antminer L11 Pro | DOGE, LTC, BEL | $6,245.00 | 21Gh/s | 3612W | 172.00J/GH | Scrypt | 57 Mon | $ 3.68 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Hashrate | 20.5 GH/s |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.