IceRiver AE3 2Gh/s 3400W ALEO Miner
$4,757.00
180-day warranty from shipping ✓ PSU Included
IceRiver AE3 is an Aleo ASIC miner rated at 2 GH/s and 3400 W, with 1.7 J/MH efficiency. The manufacturer’s manual specifies a 200–250 V AC supply, Ethernet networking and operation between 0°C and 40°C.
IceRiver AE3 2Gh/s 3400W ALEO Miner
IceRiver AE3 is an Aleo ASIC miner rated at 2 GH/s and 3400 W, with 1.7 J/MH efficiency. The manufacturer’s manual specifies a 200–250 V AC supply, Ethernet networking and operation between 0°C and 40°C.
Specifications
| Manufacturer | IceRiver |
|---|---|
| Model | IceRiver AE3 |
| Algorithm | zkSNARK |
| Mineable coins | Aleo (ALEO) |
| Hashrate | 2 GH/s ±5% |
| Power consumption | 3400 W ±10% |
| Interface | Ethernet |
| Power supply | Included |
| Warranty | 180-day warranty from shipping |
| Efficiency | 1.7 J/MH |
| Input voltage | 200–250 V AC, 50/60 Hz |
| Machine dimensions | 370 × 195 × 290 mm |
| Net weight | 15 kg |
| Noise (supplier listed) | 75 dB |
| Operating temperature | 0–40°C |
| Humidity | Below 90%, non-condensing |
Want to Explore Similar Mining Options?
| Models | Coins | Meilleur Price | Hashrate | Power | Electricity | Algorithm | ROI | Profit |
|---|---|---|---|---|---|---|---|---|
| Goldshell AE Max II | ALEO | $1,080.00 | 540Mh/s | 3200W | 5.93J/MH | zkSNARK | Never | $ -2.83 /day |
| Goldshell AE Max | ALEO | $1,050.00 | 360Mh/s | 3300W | 9.17J/MH | zkSNARK | Never | $ -3.29 /day |
| IceRiver AE1 Lite | ALEO | $999.00 | 250Mh/s | 500W | 2.00J/MH | zkSNARK | Never | $ -0.13 /day |
| IceRiver AE2 | ALEO | $750.00 – $750.00 | 720Mh/s | 1300W | 1.81J/MH | zkSNARK | Never | $ -0.22 /day |
| Goldshell E-AE1M | ALEO | $660.00 | 230Mh/s | 2000W | 8.70J/MH | zkSNARK | Never | $ -1.97 /day |
Supplier-listed estimates at the time of update; prices and profitability change.
| Hashrate | 2 GH/s ±5% |
|---|
Delivery costs shown before payment
Enter your complete delivery address at checkout to see available shipping services and charges. Shipping is separate from the product price unless expressly included. A missing rate does not mean free delivery.
Miners and spare parts
Confirmed in-stock items generally need 3–7 business days for preparation after cleared payment. Express transit is typically estimated at 5–10 business days after collection; the selected service and destination determine the actual estimate.
Cooling systems and heavy equipment
Containers, tanks, racks and other oversized equipment travel by suitable freight services. Delivery point, site access and unloading requirements must be confirmed. If no freight option is available at checkout, contact us before payment.
Customs and delivery support
Import duty, import taxes and brokerage are excluded unless the order explicitly confirms DDP or another duty-inclusive service. Tracking or waybill details are provided after dispatch. Inspect your delivery and contact us promptly about damage or missing items; an unboxing video is helpful but is not required for support.
Read the full shipping policy | Contact Mining US
Dispatch and transit estimates are separate and may be affected by customs, carrier disruption or public holidays. Applicable consumer rights remain unaffected.

Reviews
There are no reviews yet.